6.5<br />
The way forward<br />
The medium and long-term activities proposed by <strong>PDNA</strong> does not constitute a recovery and reconstruction plan per se, which would<br />
require further analytical work and programme preparation work to refine sectoral needs and priorities, elaborate implementation<br />
arrangements and complete and refine estimates of costs.<br />
Moreover, the long-term activities proposed by the <strong>PDNA</strong> and aiming at building differently and improving reliable access to agricultural<br />
water have to be coherent with the <strong>Namibia</strong>’s Vision 2030 where economic growth, poverty and income inequalities reduction and<br />
living standards improvement of its people reach the level of a developed country by 2030.<br />
Vision 2030 is to be realized through a series of National Development Plans. The third National Development Plan for 2007-2011 is<br />
currently under implementation. The total investment required to implement NDP3 is N$76.3 billion (US$9.4 billion) if the country<br />
wants to achieve 5 percent growth and is N$94.6 billion (US$11.6 billion) if the country wants to achieve 6.5 percent of growth.<br />
The proposed investments in the housing, transport (including access to social services), water and sanitation and agriculture sectors<br />
are in line with the investments proposed in NDP3. However, roads and agriculture 14 investment are already included in it but housing<br />
and water and sanitation, not really: there are housing and water and sanitation sub- programmes in NDP3 but they are not designed<br />
to flood proof housing and canals or relocate people. Therefore, the indicative investments that are proposed in the <strong>PDNA</strong> Phase 3,<br />
which represent about 4 to 5 percent of the cost of NDP3, depending on the growth scenario that is targeted, will only increase the<br />
cost of NDP3 of about 1 to 2 percent.<br />
Nevertheless, the investment proposed in <strong>PDNA</strong> Phase 3 represents a significant change in the objective of NDP3 as they are<br />
introducing climate resilience in a growth strategy.<br />
The development of the four components of a long-term climate resilient reconstruction programme should be discussed separately<br />
at a round table of development partners that could be interested at financing adaptation to climate change programme in northern<br />
<strong>Namibia</strong>.<br />
14 The NDP3 proposes 10,000 hectares of large-scale irrigation (the Green Scheme). <strong>PDNA</strong> proposes the same amount of hectares but smallscale,<br />
multi-purpose reservoirs.<br />
50<br />
<strong>Namibia</strong> POST-DISASTER NEEDS ASSESSMENT