Table 36: Summary table of medium and long-term recovery and reconstruction needs for Phases 2 and 3<br />
Phases/ Sector Phase 2 Phase 3<br />
Recovery<br />
Reconstructing (the<br />
function)<br />
Building Back<br />
Differently<br />
Housing<br />
Education<br />
Health<br />
Agriculture<br />
Manufacture<br />
Trade<br />
Tourism<br />
Transport<br />
Communications<br />
Water and<br />
Sanitation<br />
Income<br />
generation<br />
Environment<br />
Description<br />
Temporary shelter<br />
scheme<br />
Repairs to school<br />
buildings, acquisition of<br />
furniture and materials<br />
Cost<br />
(N$<br />
million)<br />
13.8<br />
5.0<br />
Repairs to hospitals 0.7<br />
Monitoring and control<br />
of morbidity levels<br />
5.7<br />
Temporary food needs,<br />
including grains, meat, etc<br />
Provision of seeds, and<br />
other inputs<br />
Assistance to land<br />
preparation<br />
Soft credit lines for SMEs<br />
to restart production<br />
Possible temporary tax relief to<br />
SMEs<br />
Soft credit lines for SMEs<br />
to restart production<br />
Possible temporary tax relief to<br />
SMEs<br />
Promotion campaigns<br />
abroad to attract tourists<br />
Rehabilitation of road<br />
traffic<br />
Cash for work<br />
programme to repair<br />
community and basic<br />
services<br />
Waste and wildlife<br />
management activities<br />
43.7<br />
33.0<br />
28.3<br />
40.0<br />
45.0<br />
10.0<br />
4.3<br />
90.0<br />
1.7<br />
Description<br />
Private sector<br />
reconstruction<br />
Provision of<br />
construction materials<br />
for poor<br />
Reconstruction of<br />
schools as is<br />
Financing to rebuild<br />
premises and replace<br />
equipment and<br />
machinery<br />
Financing to rebuild<br />
premises and replace<br />
furniture<br />
Private sector<br />
reconstruction of lodges<br />
and Etosha Park<br />
Urgent reposition of<br />
bridges and culverts<br />
Rehabilitation of water<br />
supply and waste-water<br />
systems<br />
Reconstruction of roads<br />
and parks<br />
Cost<br />
(N$<br />
million)<br />
177.9<br />
80.0<br />
15.0<br />
100.0<br />
150.0<br />
15.0<br />
Description<br />
Private sector<br />
reconstruction with<br />
disaster-resilient standards<br />
Reconstruction of schools<br />
with disaster-resilient<br />
standards<br />
Construction of adequate<br />
road access to schools<br />
Small-scale reservoirs for<br />
irrigation and downstream<br />
flood protection in 10,000<br />
hectares<br />
Diversification of<br />
agriculture production<br />
Cost<br />
(N$<br />
million)<br />
539.5<br />
50.0<br />
57.0<br />
400.0<br />
192.9 Upgrading of critical roads 1,224.0<br />
Access to critical services<br />
and markets<br />
Relocation of towers and<br />
antennas in safer areas<br />
Reconstruction of systems<br />
48.2 using disaster-resilient<br />
standards<br />
Total 321.2 796.5 3,755.7<br />
17.5<br />
680.0<br />
…<br />
763.6<br />
49