13.11.2013 Views

Namibia PDNA 2009 - GFDRR

Namibia PDNA 2009 - GFDRR

Namibia PDNA 2009 - GFDRR

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Strengthen Relief and Emergency Management at the Local Level<br />

Disaster-prone areas need to optimize their logistical support, prior to a high-risk season. The <strong>2009</strong> disaster has given local<br />

authorities a plethora of donated tents and blankets, while other essential emergency items (such as boats) continue to be scarce.<br />

Based on this experience, local authorities should compile an optimized list of logistical support facilities: the type of equipment and<br />

goods needed for the next emergency (considering that the next time it might be a drought, or a wildfire); their optimal location and<br />

storage needs; how to procure and distribute food; how to transport people and goods; whether to hold humanitarian assistance in<br />

warehouses for the season or procure it locally, etc. The budget for logistical support and the corresponding plan should be an integral<br />

part of the local disaster contingency plans.<br />

Table 37: Estimated disaster risk reduction needs<br />

Priorities<br />

1. Enabling Legislation and Strengthened Institutions for DRR<br />

Estimated<br />

Costs<br />

(US$)<br />

Schedule<br />

1.A. DRR Act and Legislation 50,000 1 year (2010)<br />

1.B. Institutional DRR Strengthening at National and Regional Level 750,000 3 years (2010-2012)<br />

2. Strengthened Risk Assessment<br />

2.A. Climate Variability and Flood, Drought and Wild Fire Hazard Modelling<br />

(3 Zones)<br />

150,000 1 year (2010)<br />

2.B. Participatory Risk Flood Mapping (3 Zones) 1,600,000 1.5 years (<strong>2009</strong>-2010)<br />

2.C. Operations Room for Hazard Monitoring and Response (National) 550,000 2 years (2010-2011)<br />

2.D. Strengthened People-centered Early Warning and Transborder<br />

Cooperation (with Angola and Zambezi River Authority)<br />

150,000<br />

3. Strengthened Community Awareness<br />

3. A. Living with Floods and Droughts Campaign 400,000 2 years (2010-2011)<br />

4. Strengthened Disaster Preparedness and Response<br />

4.A. Preparation of Disaster Contingency Plans and Operations Manuals 350,000 1 year (2010)<br />

4.B. Simulation Training 100,000 1 year (2011)<br />

4.C. Strengthen Relief and Emergency System Management at Local Level<br />

(3 Zones)<br />

1,500,000 2 years (2010-2011)<br />

Total Estimated Needs for DRR Strengthening 5,610,000<br />

57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!