16.11.2013 Views

preliminary fy 2011-12 city of glendale, az annual budget book

preliminary fy 2011-12 city of glendale, az annual budget book

preliminary fy 2011-12 city of glendale, az annual budget book

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20<strong>12</strong>-2021 CAPITAL IMPROVEMENT PLAN<br />

CIP Table <strong>of</strong> Contents<br />

CIP TABLE OF CONTENTS<br />

Page<br />

Table <strong>of</strong> Contents 278<br />

Introduction 280<br />

Financing the CIP 285<br />

Impact <strong>of</strong> the CIP on the Operating Budget 303<br />

Summary by Type <strong>of</strong> Project 305<br />

Summary <strong>of</strong> All Capital Projects by Funding Type 306<br />

FUND SUMMARIES<br />

BOND CONSTRUCTION FUNDS 307<br />

Street/Parking 308<br />

1980 – Street/Parking Bonds 309<br />

Open Space & Trails 313<br />

2140 – Open Space/Trails Construction 314<br />

Parks 320<br />

2060 – Parks Construction 321<br />

Library 341<br />

2160 – Library Construction 342<br />

Public Safety 345<br />

2040 – Public Safety Construction 346<br />

Government Facilities 356<br />

2080 – Government Facilities Construction 357<br />

Cultural Facilities/Historical Preservation 363<br />

2130 – Cultural Facility Construction 364<br />

Economic Development 367<br />

2100 – Economic Development Construction 368<br />

Flood Control 371<br />

2180 – Flood Control Construction 372<br />

DEVELOPMENT IMPACT FEE FUNDS 378<br />

Roadway Improvements 379<br />

1600 – DIF – Roadway Improvements 380<br />

Open Space 383<br />

1520 – DIF – Citywide Open Space 384<br />

278

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!