FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2400 - Water Category: Revenue<br />

Project: 61023 - Water System Security (I) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

Installation <strong>of</strong> equipment to further enhance security <strong>of</strong> the <strong>city</strong>'s water supply, treatment plants and distribution<br />

system.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $0 $0 $117,000<br />

Construction $0 $0 $0 $0 $0 $2,065,000<br />

Finance Charges $0 $0 $0 $0 $0 $33,000<br />

Engineering Charges $0 $0 $0 $0 $0 $55,000<br />

Arts $0 $0 $0 $0 $0 $20,650<br />

Contingency $0 $0 $0 $0 $0 $229,065<br />

Sub-Total New Funding $0<br />

$0 $0 $0 $0 $2,519,715<br />

FY 20<strong>12</strong> Carryover<br />

$281,215 $0 $0 $0 $0 $0<br />

TOTAL $281,215 $0 $0 $0 $0 $2,519,715<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

Project: 61024 - Cholla Water Plant Process Imp (I) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

This project will include improvements at Cholla Water Treatment Plant to meet new regulatory requirements.<br />

The improvements include the installation <strong>of</strong> new variable frequency drive systems, odor control, soil<br />

stabilization, solids handling facility repair and improvements, and reservoir lining rehabilitation or replacement.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $70,000 $100,000 $0 $0 $0 $0<br />

Construction $275,000 $330,000 $0 $0 $0 $0<br />

Engineering Charges $14,835 $18,490 $0 $0 $0 $0<br />

Arts $2,750 $3,300 $0 $0 $0 $0<br />

Contingency $37,415 $48,210 $0 $0 $0 $0<br />

Sub-Total New Funding $400,000 $500,000 $0 $0 $0 $0<br />

FY 20<strong>12</strong> Carryover<br />

$1,186,806 $0 $0 $0 $0 $0<br />

TOTAL $1,586,806 $500,000 $0 $0 $0 $0<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

420<br />