16.11.2013 Views

preliminary fy 2011-12 city of glendale, az annual budget book

preliminary fy 2011-12 city of glendale, az annual budget book

preliminary fy 2011-12 city of glendale, az annual budget book

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2130 - Cultural Facility Construction Category: 6%<br />

Project: 84307 - Morcomb Property (I) Funding Source:<br />

General Obligation Bonds<br />

Project Description:<br />

Restoration <strong>of</strong> the historic 1936 Morcomb Adobe House and the historic Morcomb Service Station located at<br />

6040 West Myrtle Avenue and listed on the National Register. The project is part <strong>of</strong> the Myrtle Avenue Cultural<br />

Entryway. The project will consist <strong>of</strong> restoration <strong>of</strong> the historic house and historic gas station. This project will<br />

complete the Cultural Entryway.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

FY 20<strong>12</strong> Carryover<br />

$104,876 $0 $0 $0 $0 $0<br />

TOTAL $104,876 $0 $0 $0 $0 $0<br />

Operating Description:<br />

Property will be owned by the City <strong>of</strong> Glendale. Field Operations and Parks & Recreation will maintain the<br />

buildings and landscaping. No occupancy <strong>of</strong> either building is contemplated. The additional O and M will be<br />

absorbed by the department.<br />

Operating Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Bldg. Maint. $1,000 $1,030 $1,061 $1,093 $1,<strong>12</strong>6 $6,155<br />

Landscape $1,000 $1,030 $1,061 $1,093 $1,<strong>12</strong>6 $6,155<br />

TOTAL $2,000 $2,060 $2,<strong>12</strong>2 $2,186 $2,252 $<strong>12</strong>,310<br />

Project: 84308 - Sahuaro Ranch Carriage House (R) Funding Source:<br />

General Obligation Bonds<br />

Project Description:<br />

Repair and replace the interior wood siding with the intent being to restore the weather tightness <strong>of</strong> the structure.<br />

Repair the deteriorating parts <strong>of</strong> the bay window. Replace the metal flashing at the ro<strong>of</strong> <strong>of</strong> the bay and install<br />

flooring with materials that meet ADA and historical standards. Replace all electrical infrastructure and prepare<br />

and re-paint all previously painted interior surfaces,<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $0 $0 $46,200<br />

Construction $0 $0 $0 $0 $0 $132,000<br />

Finance Charges $0 $0 $0 $0 $0 $4,960<br />

Engineering Charges $0 $0 $0 $0 $0 $11,000<br />

Arts $0 $0 $0 $0 $0 $1,320<br />

Equipment $0 $0 $0 $0 $0 $35,000<br />

Contingency $0 $0 $0 $0 $0 $22,500<br />

TOTAL $0 $0 $0 $0 $0 $252,980<br />

Operating Description:<br />

No additional O and M is needed.<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

365<br />

Return to CIP TOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!