FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2400 - Water Category: Revenue<br />

Project: 61021 - N River/Agua Fria Storage Proj (N) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

To acquire a 20% ownership in the New River/Agua Fria Underground Storage Facility administered by the Salt<br />

River Project. The additional recharge capa<strong>city</strong> developed through this project will accommodate the effluent<br />

produced at the recently expanded West Area Water Reclamation Facility.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Miscellaneous/Other $0 $0 $1,300,000 $0 $0 $0<br />

Sub-Total New Funding $0<br />

$0 $1,300,000 $0 $0 $0<br />

FY 20<strong>12</strong> Carryover<br />

$1,257,030 $0 $0 $0 $0 $0<br />

TOTAL $1,257,030 $0 $1,300,000 $0 $0 $0<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

Project: 61027 - Water Line Extension (N) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

Water line extensions are installed where needed to extend the <strong>city</strong>'s water transmission and distribution<br />

systems to meet projected demand from future development. Projects funded from this account typically involve<br />

<strong>city</strong> participation in pipeline over sizing and other distribution piping extensions as needed to accommodate<br />

projected growth.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $0 $600,000 $700,000<br />

Construction $0 $0 $0 $0 $1,150,000 $3,250,000<br />

Finance Charges $0 $0 $0 $0 $26,100 $59,250<br />

Engineering Charges $0 $0 $0 $0 $28,399 $64,101<br />

Arts $0 $0 $0 $0 $11,500 $32,500<br />

Contingency $0 $0 $0 $0 $174,000 $394,149<br />

Sub-Total New Funding $0<br />

$0 $0 $0 $1,989,999 $4,500,000<br />

FY 20<strong>12</strong> Carryover<br />

$1,472,297 $0 $0 $0 $0 $0<br />

TOTAL $1,472,297 $0 $0 $0 $1,989,999 $4,500,000<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

Project: 61029 - Regional GAC Plant (N) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

The <strong>city</strong> currently pays $1.00 per pound for granular activated carbon (GAC) regeneration at the Oasis Water<br />

Campus and Cholla Water Treatment Plant. An evaluation will be conducted to determine whether the <strong>city</strong><br />

should pursue the purchase <strong>of</strong> a share <strong>of</strong> a regional GAC plant to possibly reduce costs for the <strong>city</strong>.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $0 $0 $82,900<br />

Engineering Charges $0 $0 $0 $0 $0 $9,119<br />

Contingency $0 $0 $0 $0 $0 $7,981<br />

TOTAL $0 $0 $0 $0 $0 $100,000<br />

Operating Description:<br />

There are no direct O and M costs to the City <strong>of</strong> Glendale related to this project. All O and M costs will be<br />

included in the cost <strong>of</strong> GAC regeneration. Regeneration costs are based on a per pound rate and will include any<br />

ongoing project O and M costs.<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

429<br />