16.11.2013 Views

preliminary fy 2011-12 city of glendale, az annual budget book

preliminary fy 2011-12 city of glendale, az annual budget book

preliminary fy 2011-12 city of glendale, az annual budget book

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2060 - Parks Construction Category: 20%<br />

Project: 70528 - Family Recreation Center-West (N) Funding Source:<br />

General Obligation Bonds<br />

Project Description:<br />

Development <strong>of</strong> a multi-generational recreation center that targets a diverse demographic. The construction <strong>of</strong><br />

the 70,000 sq ft family recreation center would provide a gymnasium, multi-purpose rooms, activity areas and<br />

exercise centers. Equipment furnishings include estimated costs for furnishing a recreation facility and exercise<br />

room amenities, such as fitness equipment, tables, chairs, and audio/visual equipment. Project addresses the<br />

Parks and Recreation Master Plan recommendation to develop a multi-generational recreation center that target<br />

a diverse demographic.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $0 $0 $5,271,175<br />

Construction $0 $0 $0 $0 $0 $15,060,500<br />

Finance Charges $0 $0 $0 $0 $0 $615,184<br />

IT/Phone/Security $0 $0 $0 $0 $0 $260,000<br />

Engineering Charges $0 $0 $0 $0 $0 $<strong>12</strong>2,000<br />

Arts $0 $0 $0 $0 $0 $150,605<br />

Equipment $0 $0 $0 $0 $0 $1,506,050<br />

Contingency $0 $0 $0 $0 $0 $2,298,551<br />

TOTAL $0 $0 $0 $0 $0 $25,284,065<br />

Operating Description:<br />

Additional O and M calculated for 21 months beginning in September 2019. Staffing levels are based on a seven<br />

day per week operation and includes a Recreation Manager, a Office Support Supervisor, 3 Senior Recreation<br />

Coordinators, 2 Secretaries, 3 Recreation Programmers, a Service Worker II, a Service Worker III, 2 Building<br />

Maintenance Workers, and 10 PT Recreation Programmers (benefits included for FTE's only).<br />

Supplies/Contracts include $2.70 sq ft x 70,000 sq ft facility. Utilities include $2.70 sq ft for electri<strong>city</strong> x 70,000 sq<br />

ft. Building maintenance includes HVAC at $2.50 sq ft x 70,000 sq ft, custodial services at $1.62 per sq ft x<br />

70,000, plumbing costs at $4.60 per sq ft x 70,000 sq ft. Equipment maintenance includes vehicle maintenance<br />

($0.17 per mile) and fuel ($0.22 per mile) for three 1/2 ton pickup trucks driven 8,000 miles <strong>annual</strong>ly. Insurance<br />

includes $786 x 19 employees. Electrical includes fire alarm system at $150 per month, which includes the<br />

monitoring subscription dedicated phone lines. Vehicle replacement includes vehicle replacement at $2,050 x 3.<br />

Technology replacement includes $540 x 8 desktop computers and a network printer at $1,053 per year.<br />

Landscape maintenance and water costs are included in project 2060-70532. Building water is calculated at<br />

$0.195 x 70,000 sq ft. Refuse includes two 6-yard containers x 3 pick-ups per week at $2,047 <strong>annual</strong>ly.<br />

Operating Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Staffing $0 $0 $0 $0 $0 $2,500,847<br />

Supplies/Contr $0 $0 $0 $0 $0 $426,167<br />

Utilities $0 $0 $0 $0 $0 $426,167<br />

Bldg. Maint. $0 $0 $0 $0 $0 $1,376,361<br />

Equip. Maint. $0 $0 $0 $0 $0 $21,105<br />

Insurance $0 $0 $0 $0 $0 $33,674<br />

Electrical $0 $0 $0 $0 $0 $4,059<br />

PC/Vehicle Replacement $0 $0 $0 $0 $0 $25,983<br />

Water $0 $0 $0 $0 $0 $30,779<br />

Refuse $0 $0 $0 $0 $0 $9,234<br />

TOTAL $0 $0 $0 $0 $0 $4,854,376<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

339<br />

Return to CIP TOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!