FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2<strong>12</strong>0 - Airport Capital Grants Category: Other<br />

Project: 79504 - Airport-Security Upgrade (I) Funding Source:<br />

Grants/City Match<br />

Project Description:<br />

This is an FAA and ADOT funded project to acquire and install perimeter security equipment.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $145,985 $1,654,502 $0 $0<br />

Engineering Charges $0 $0 $4,015 $45,498 $0 $0<br />

Sub-Total New Funding $0<br />

$0 $150,000 $1,700,000 $0 $0<br />

FY 20<strong>12</strong> Carryover<br />

$1,462,500 $0 $0 $0 $0 $0<br />

TOTAL $1,462,500 $0 $150,000 $1,700,000 $0 $0<br />

Operating Description:<br />

No additional O and M is needed at this time.<br />

Project: 79515 - Airport-Pavement Maintenance (I) Funding Source:<br />

Grants/City Match<br />

Project Description:<br />

Runway and taxiway pavement maintenance is needed when cracks and deterioration occurs on existing asphalt.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $95,877 $0 $0 $0 $0 $0<br />

Construction $0 $142,450 $166,192 $522,317 $0 $0<br />

Engineering Charges $4,<strong>12</strong>3 $6,<strong>12</strong>5 $7,146 $22,460 $0 $0<br />

Arts $0 $1,425 $1,662 $5,223 $0 $0<br />

TOTAL $100,000 $150,000 $175,000 $550,000 $0 $0<br />

Operating Description:<br />

No additional O and M is needed at this time.<br />

Project: 79516 - Airport-RSA Remove Blast Fence (I) Funding Source:<br />

Grants/City Match<br />

Project Description:<br />

The FAA runway safety action group has identified the moving <strong>of</strong> the blast fences in the runway safety area<br />

(RSA) at the end <strong>of</strong> Runway 19 due to a safety h<strong>az</strong>ard.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $48,149 $0 $0 $0 $0 $0<br />

Construction $276,650 $0 $0 $0 $0 $0<br />

Engineering Charges $15,915 $0 $0 $0 $0 $0<br />

Arts $2,767 $0 $0 $0 $0 $0<br />

Sub-Total New Funding $343,481<br />

$0 $0 $0 $0 $0<br />

FY 20<strong>12</strong> Carryover<br />

$292,500 $0 $0 $0 $0 $0<br />

TOTAL $635,981 $0 $0 $0 $0 $0<br />

Operating Description:<br />

No additional O and M is needed for this project.<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

478<br />