FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2400 - Water Category: Revenue<br />

Project: 61036 - Zn4 Groundwater Trtment Plant (I) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

This 10 million gallons per day (MGD) Groundwater Treatment Plant was identified in the Black & Veatch<br />

"Comprehensive Water Facilities Planning and Design" report <strong>of</strong> September 2003 as a key water supply<br />

component to provide additional water during plant outages such as canal dry-ups and to help meet peak water<br />

demands. This project will include additional conveyance pipeline, a supply well, and brine disposal ponds.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $80,000 $0 $1,400,000<br />

Construction $0 $0 $0 $810,000 $0 $14,060,000<br />

Finance Charges $0 $0 $0 $13,350 $0 $231,000<br />

Engineering Charges $0 $0 $0 $6,260 $0 $108,740<br />

Arts $0 $0 $0 $8,100 $0 $140,600<br />

Contingency $0 $0 $0 $82,290 $0 $1,559,660<br />

Sub-Total New Funding $0<br />

$0 $0 $1,000,000 $0 $17,500,000<br />

FY 20<strong>12</strong> Carryover<br />

$20,794,830 $0 $0 $0 $0 $0<br />

TOTAL $20,794,830 $0 $0 $1,000,000 $0 $17,500,000<br />

Operating Description:<br />

This is an expansion <strong>of</strong> treatment capa<strong>city</strong> for the Zone 4 Water Treatment Plant between FY's 2015 and 2021.<br />

Therefore the new O and M costs reflect the need for additional staff, chemicals and utilities. FTE = Three plant<br />

operators @ $71,500 per year. Chemical, utilities, and maintenance cost are based on actual cost during a pilot<br />

study to treat groundwater. A supplemental will be submitted in the future for the additional O and M costs.<br />

Operating Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Staffing $0 $0 $0 $0 $0 $1,320,192<br />

Supplies/Contr $0 $0 $0 $0 $0 $2,219,401<br />

Utilities $0 $0 $0 $0 $0 $336,270<br />

Equip. Maint. $0 $0 $0 $0 $0 $298,771<br />

Insurance $0 $0 $0 $0 $0 $39,446<br />

TOTAL $0 $0 $0 $0 $0 $4,214,080<br />

Project: 61040 - Loop 101 Wells & Piping (I) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

Rehabilitate existing wells in Zone 4 to supply raw water to the projected Loop 101 Ground Water Treatment<br />

Plant (GWTP) (see the Loop 101 Water Treatment Project # 61038). These improvements will be needed to<br />

meet the potable water demand at build out for this area <strong>of</strong> the <strong>city</strong> and to also meet water quality regulations.<br />

These improvements are identified in the revised Utilities Water Master Plan completed by Black and Veatch.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $0 $0 $140,000<br />

Construction $0 $0 $0 $0 $0 $1,510,000<br />

Finance Charges $0 $0 $0 $0 $0 $24,750<br />

Engineering Charges $0 $0 $0 $0 $0 $45,375<br />

Arts $0 $0 $0 $0 $0 $15,100<br />

Contingency $0 $0 $0 $0 $0 $164,775<br />

TOTAL $0 $0 $0 $0 $0 $1,900,000<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

421<br />