16.11.2013 Views

preliminary fy 2011-12 city of glendale, az annual budget book

preliminary fy 2011-12 city of glendale, az annual budget book

preliminary fy 2011-12 city of glendale, az annual budget book

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2<strong>12</strong>0 - Airport Capital Grants Category: Other<br />

Project: T1470 - Airport-EMAS Taxiway Pavement (N) Funding Source:<br />

Grants/City Match<br />

Project Description:<br />

Design and pave taxiway on Runway 01 for Engineered Materials Arresting Systems (EMAS) product for the<br />

safety <strong>of</strong> aircraft over running the runway end.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $67,114 $0 $0<br />

Construction $0 $0 $0 $0 $664,767 $0<br />

Engineering Charges $0 $0 $0 $2,886 $28,585 $0<br />

Arts $0 $0 $0 $0 $6,648 $0<br />

TOTAL $0 $0 $0 $70,000 $700,000 $0<br />

Operating Description:<br />

No additional O and M is required for this project.<br />

Project: T1471 - Airport-EMAS Design/Constr (N) Funding Source:<br />

Grants/City Match<br />

Project Description:<br />

Design and construct Engineered Materials Arresting Systems (EMAS) at Runway's 01 and 19 in the runway<br />

safety areas to stop aircraft that are in an emergency situation and have run out <strong>of</strong> runway length.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $569,086 $0 $0<br />

Construction $0 $0 $0 $0 $7,043,974 $0<br />

Engineering Charges $0 $0 $0 $6,914 $85,586 $0<br />

Arts $0 $0 $0 $0 $70,440 $0<br />

TOTAL $0 $0 $0 $576,000 $7,200,000 $0<br />

Operating Description:<br />

No additional O and M is needed at this time.<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

481<br />

Return to CIP TOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!