FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2360 - Water & Sewer Category: Revenue<br />

Project: T2283 - Computerized Maint. Mgmt Sys. (R) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

The City <strong>of</strong> Glendale Utilities Department utilizes Computerized Maintenance Management System (CMMS), to<br />

track data regarding the operation and maintenance <strong>of</strong> the <strong>city</strong>'s water and wastewater treatment, distribution<br />

and collection systems. This database system eliminates manual record keeping. The CMMS s<strong>of</strong>tware is<br />

dependent on both computer hardware and the operating system. By FY 2015, the computer hardware and<br />

operating system are not expected to support the current version <strong>of</strong> CMMS.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $1<strong>12</strong>,550 $130,000 $400,000<br />

Construction $0 $0 $0 $0 $2,465,000 $4,000,000<br />

Finance Charges $0 $0 $0 $0 $39,300 $66,000<br />

Engineering Charges $0 $0 $0 $1,465 $33,772 $57,263<br />

Arts $0 $0 $0 $0 $24,650 $40,000<br />

Contingency $0 $0 $0 $10,985 $307,278 $436,737<br />

TOTAL $0 $0 $0 $<strong>12</strong>5,000 $3,000,000 $5,000,000<br />

Operating Description:<br />

A current position will need to be reclassified once the project begins as staff will be providing a higher level <strong>of</strong><br />

s<strong>of</strong>tware support services. $20,000 <strong>annual</strong>ly will cover the reclassified positions additional salary and salary<br />

related benefits. A supplemental <strong>budget</strong> request will be submitted once the project is near completion.<br />

Operating Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Supplies/Contr $0 $0 $0 $20,000 $20,600 $1<strong>12</strong>,649<br />

TOTAL $0 $0 $0 $20,000 $20,600 $1<strong>12</strong>,649<br />

Project: T2284 - Radio Phase IV Equipment (R) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

This project includes the replacement <strong>of</strong> the existing microwave radio equipment that is a critical component for<br />

the wide area networking <strong>of</strong> the Supervisory Control and Data Acquisition (SCADA) system. The microwave<br />

radio equipment installed under the Radio Phase III project has a supportable and operational life span <strong>of</strong><br />

approximately five years.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Construction $0 $0 $700,000 $0 $0 $700,000<br />

Engineering Charges $0 $0 $25,200 $0 $0 $25,200<br />

Arts $0 $0 $7,000 $0 $0 $7,000<br />

Contingency $0 $0 $67,800 $0 $0 $67,800<br />

TOTAL $0 $0 $800,000 $0 $0 $800,000<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

417<br />