FY 20<strong>12</strong>-2021 Capital Improvement Plan<br />

Capital Project Expenses Detail<br />

2420 - Sewer Category: Revenue<br />

Project: 63021 - Sweetwater & 55th Ave SLS (R) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

The sewage lift station (SLS) at Sweetwater and 55th Avenue requires equipment upgrades in order to ensure<br />

continued system reliability, sufficient treatment capa<strong>city</strong> and public health. This project includes the design and<br />

construction <strong>of</strong> new flow metering equipment and odor control elements as well as the replacement or<br />

rehabilitation <strong>of</strong> the station's pumps, valves, piping, electrical system elements, etc.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $100,000 $100,000 $0 $0<br />

Construction $0 $0 $769,000 $781,000 $0 $0<br />

Finance Charges $0 $0 $13,035 $0 $0 $0<br />

Engineering Charges $0 $0 $23,898 $24,228 $0 $0<br />

Arts $0 $0 $7,690 $7,810 $0 $0<br />

Contingency $0 $0 $86,377 $86,746 $0 $0<br />

TOTAL $0 $0 $1,000,000 $999,784 $0 $0<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

Project: T3614* - Citywide Manhole Rehab (R) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

The requested funding will be used to rehabilitate existing sewer manholes that have reached the end <strong>of</strong> their<br />

expected life as identified in the 2008 Sewer Master Plan and Evaluation by Camp, Dresser, and McKee (CDM).<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Construction $200,000 $500,000 $500,000 $500,000 $500,000 $0<br />

Engineering Charges $6,545 $16,364 $16,364 $16,364 $16,364 $0<br />

Arts $2,000 $5,000 $5,000 $5,000 $5,000 $0<br />

TOTAL $208,545 $521,364 $521,364 $521,364 $521,364 $0<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

Project: 63000 - 67th-115th, Northern-C'Back (N) Funding Source:<br />

Water & Sewer Revenues<br />

Project Description:<br />

Installation <strong>of</strong> new sewer lines to improve existing sewer mains as identified by Hennings, Durham, and<br />

Richardson (HDR) West Area Sewer Depth Study <strong>of</strong> December 2000. These projects will provide deeper outfall<br />

sewers for development in the area and will relieve or replace existing sewers that have inadequate slope.<br />

Capital Costs: FY 20<strong>12</strong> FY 2013 FY 2014 FY 2015 FY 2016 FYs 17-21<br />

Design $0 $0 $0 $550,000 $550,000 $0<br />

Construction $0 $0 $0 $3,460,000 $4,000,000 $0<br />

Finance Charges $0 $0 $0 $61,650 $68,250 $0<br />

Engineering Charges $0 $0 $0 $43,332 $49,168 $0<br />

Arts $0 $0 $0 $34,600 $40,000 $0<br />

Contingency $0 $0 $0 $401,623 $456,877 $0<br />

TOTAL $0 $0 $0 $4,551,205 $5,164,295 $0<br />

Operating Description:<br />

No additional O and M is need for this project.<br />

* New Project<br />

N=New Asset, R=Replacement <strong>of</strong> Existing Asset, I=Improvement <strong>of</strong> Existing Asset<br />

436<br />

Return to CIP TOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!