~J ctty<strong>of</strong> Construction Change Order<br />
··· <strong>New</strong> <strong>Braunfels</strong><br />
::;.----<br />
""<br />
-<br />
ProJect: Goodwn Lane Improvements Change Order No, 2<br />
Conmctor: DNT ConstnJctloo u.c Date• October 14, 2010<br />
Address: 18952 Rldland Rd. san Antonio Texas 78259<br />
In accordance willl 11\e lorms <strong>of</strong> 11\e C>wner.Q>ntractor Agr1!0men~ dalod April 27, 2010, between the uty <strong>of</strong> <strong>New</strong> <strong>Braunfels</strong>, OWNER, and DNT ConstnJcllon UC, COOTRACTOR,<br />
CONTRACTOR Is herertr1 dlr«ttd to make add~ or altmllolls In the Worl< w1UI cklails and costs as described below. Any compensallon paid In conjund!on will! the ltrms <strong>of</strong> lhls Cha119er<br />
Order shall comprise totll yrnont for 11\e Worlto!Chi"'lt plus oil payment for 11\e lnterrupllon <strong>of</strong> Schedules, Slop Work Onlers, Eldtnded Overhead, Delay, 0< any olher l11'9'ct, claim<br />
or ripple elrKt, and by signing spedftcaUy waiYors any Reservallon or Claim for Addlllonil Compensotlon with respect to the Subject <strong>of</strong> this Cho1190 Order. EXcept as modllled by Cha119e<br />
Order, aU work performed under lhis Change OrdershaR be complelod In accordance wah the Contract Documents.<br />
10/25/2010<br />
PURPOSE FOR THIS CHANGE ORDER:<br />
Re-route waterline around the proposed box advert due to the depth <strong>of</strong> the existing waterline. lower existing waterline under the proposed wastewater<br />
service at Northgate Ortle<br />
Jtem No. I I I I Original I R.eva.ed<br />
Description Unit Unit Price Contract<br />
Quantity<br />
Ouanlltv<br />
1 Re-route Waterline at Box Culvert .<br />
Material IS 3,660.60 . 1.00<br />
Labor & Equipment IS 3,446.74 . 1.00<br />
Bond LS 175.66 1.00<br />
Mobilization EA 1,500.00 . 1.00<br />
2<br />
Lower Waterline under Wastewater Service at<br />
Northgate Clrde<br />
Material IS 2,739.50 . 1.00<br />
Labor & Equipment IS 2,538.18 . 1.00<br />
Traffic Control EA 259.00 . 1.00<br />
Bond IS 143.42 . 1.00<br />
Mobilization EA 1,500.00 . 1.00<br />
I Changeln I Changeln<br />
Con Inlet Price Contnc:t lime<br />
$3,660.60<br />
$3,446.74<br />
$175.66<br />
$1,500.00<br />
$2,739.50<br />
$2,538.18<br />
$259.00<br />
$143.42<br />
$1,500.00<br />
2.00<br />
2.00<br />
TOTAL· THIS CHANGE ORDER<br />
$15,963.10<br />
4<br />
ORIGINAL CONTRACT AMOUNT: $967,863.95<br />
Previous Change Orders $58,330.10<br />
Amount <strong>of</strong> This Change Order $15,963.10<br />
TOTAL OF AU. CHANGE ORD ERS $74,293.20<br />
REVISED CONTRACT AMOUNT: $1,042,157,15<br />
ORIGINAL CONTRACT TIME: 0 Days<br />
Previous Change Orders 6 Days<br />
This Change Order 4 Days<br />
TOTAL OF ALL CHANGE ORDERS 10 Days<br />
REVISED CONTRACT TIME: 10 Days<br />
ORIGINAL CONTRACf {FINAL)(SUBSTPMlAL) COMPlETION DATE: A[!rll9, 2011<br />
REVISED {FINAL)(SUBSTAHTIAL) COMPLETION DATE: April19, 2011<br />
RECOMMENDED AND APPROVED:<br />
~I 10/25/2010<br />
..<br />
<strong>New</strong> <strong>Braunfels</strong> Utilities<br />
ConAJJl<br />
Date<br />
'rf'T<br />
Design ~fl9\'leer<br />
:r---.....<br />
1~!2r~<br />
Date<br />
Support ServiCES Director<br />
Date<br />
Date<br />
Project Manager<br />
Date<br />
<strong>City</strong> Couno1 Appro~~al Date:<br />
Department Director<br />
Date<br />
<strong>City</strong> Manager<br />
Date<br />
P.O. BOJC ) 11747<br />
Ntw Btaunfeb. Texas 7811 1-I H 7<br />
Td 830.221.1020<br />
FD 830.609.2 109<br />
v.vtw.l'lbteu s.org<br />
424 S CasteH Avenue<br />
Nf!W Br•unfels. Tuas 78130