IGC<br />

<strong>Annual</strong> <strong>Report</strong> 2007<br />

these SSCs has to be done by<br />

analysis, testing or from<br />

experience data base. The SSC<br />

list was further segregated<br />

based on qualification<br />

methodology. The document on<br />

safety analysis has been<br />

reviewed by AERB.<br />

The major structures to be<br />

analyzed are the Reactor<br />

Containment Building (RCB),<br />

Steam Generator Building<br />

(SGB), Service Building (SB)<br />

and Control Building (CB). The<br />

major systems to be qualified<br />

by analysis are the primary<br />

sodium system and secondary<br />

sodium system. Consultancy<br />

contract was awarded to M/s<br />

Engineering Mechanics and<br />

<strong>Research</strong> Company (M/s<br />

EMRC), Bangalore, <strong>for</strong> analysis<br />

of RCB, SB & SGB as well as the<br />

secondary sodium system.<br />

EMRC has completed the<br />

modeling and developed floor<br />

response spectra <strong>for</strong> all the<br />

buildings <strong>for</strong> the RBGM. The<br />

modeling of secondary sodium<br />

system has also been<br />

completed by EMRC, and<br />

analysis <strong>for</strong> the RBGM is in<br />

progress. CED, <strong>IGCAR</strong> carried<br />

out a parallel modeling of RCB<br />

<strong>for</strong> checking the EMRC results.<br />

The analysis of CB has been<br />

carried out by CSED, AERB. The<br />

modeling of the primary system<br />

has been completed by NEG,<br />

<strong>IGCAR</strong>, and analysis <strong>for</strong> the<br />

RBGM and floor response<br />

spectra thereof is in progress.<br />

The analysis will include not<br />

only structural integrity, but also<br />

scrammability of the control<br />

rods and pump non-seizure. In<br />

addition, CED, <strong>IGCAR</strong> has<br />

done the modeling of some<br />

support system structures,viz<br />

raw water pump house, cooling<br />

tower and maintenance<br />

building. Analysis of RCB<br />

ventilation ducting is being<br />

done by ROMG.<br />

Ten components have been<br />

identified <strong>for</strong> qualification by<br />

testing on shake-table. For<br />

these, the as-built drawings of<br />

the panels<br />

have been<br />

prepared.<br />

Testing will be<br />

taken up<br />

shortly.<br />

qualified from experience data<br />

base, subject to proper<br />

anchorages. Plant walk-down<br />

was carried out by a team of<br />

engineers & specialists from<br />

NPCIL, AERB & <strong>IGCAR</strong>. Seismic<br />

interactions and anchorages<br />

were studied. The findings of<br />

the walk-down have been<br />

reviewed by the AERB Review<br />

Committee. The walk-down<br />

revealed several areas where<br />

proper anchorages are<br />

required, and areas where<br />

seismic house-keeping is called<br />

<strong>for</strong> to avoid seismic interaction.<br />

Seismic house-keeping has<br />

been completed in zero level of<br />

RCB.<br />

The results of the analysis of<br />

the SSC and of the qualification<br />

tests of components in the<br />

shake table will be submitted to<br />

the Review Committee. Retrofitting<br />

measures, if required,<br />

will be taken up based on the<br />

recommendations of the Review<br />

Committee. The seismic<br />

anchorages will be modified<br />

wherever required, based on<br />

the findings of the plant walkdown<br />

and comments of the<br />

Review Committee. These are<br />

the minimum required <strong>for</strong> plant<br />

relicensing.<br />

Fig.2 Review basis ground motion<br />

Several<br />

components<br />

have been<br />

identified as<br />

g e t t i n g<br />

Finally, system modeling,<br />

capacity assessment of<br />

components and seismic<br />

margin of the plant will be<br />

assessed as a research activity.<br />

6 FAST BREEDER TEST REACTOR