IGCAR : Annual Report - Indira Gandhi Centre for Atomic Research
IGCAR : Annual Report - Indira Gandhi Centre for Atomic Research
IGCAR : Annual Report - Indira Gandhi Centre for Atomic Research
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
IGC<br />
<strong>Annual</strong> <strong>Report</strong> 2007<br />
these SSCs has to be done by<br />
analysis, testing or from<br />
experience data base. The SSC<br />
list was further segregated<br />
based on qualification<br />
methodology. The document on<br />
safety analysis has been<br />
reviewed by AERB.<br />
The major structures to be<br />
analyzed are the Reactor<br />
Containment Building (RCB),<br />
Steam Generator Building<br />
(SGB), Service Building (SB)<br />
and Control Building (CB). The<br />
major systems to be qualified<br />
by analysis are the primary<br />
sodium system and secondary<br />
sodium system. Consultancy<br />
contract was awarded to M/s<br />
Engineering Mechanics and<br />
<strong>Research</strong> Company (M/s<br />
EMRC), Bangalore, <strong>for</strong> analysis<br />
of RCB, SB & SGB as well as the<br />
secondary sodium system.<br />
EMRC has completed the<br />
modeling and developed floor<br />
response spectra <strong>for</strong> all the<br />
buildings <strong>for</strong> the RBGM. The<br />
modeling of secondary sodium<br />
system has also been<br />
completed by EMRC, and<br />
analysis <strong>for</strong> the RBGM is in<br />
progress. CED, <strong>IGCAR</strong> carried<br />
out a parallel modeling of RCB<br />
<strong>for</strong> checking the EMRC results.<br />
The analysis of CB has been<br />
carried out by CSED, AERB. The<br />
modeling of the primary system<br />
has been completed by NEG,<br />
<strong>IGCAR</strong>, and analysis <strong>for</strong> the<br />
RBGM and floor response<br />
spectra thereof is in progress.<br />
The analysis will include not<br />
only structural integrity, but also<br />
scrammability of the control<br />
rods and pump non-seizure. In<br />
addition, CED, <strong>IGCAR</strong> has<br />
done the modeling of some<br />
support system structures,viz<br />
raw water pump house, cooling<br />
tower and maintenance<br />
building. Analysis of RCB<br />
ventilation ducting is being<br />
done by ROMG.<br />
Ten components have been<br />
identified <strong>for</strong> qualification by<br />
testing on shake-table. For<br />
these, the as-built drawings of<br />
the panels<br />
have been<br />
prepared.<br />
Testing will be<br />
taken up<br />
shortly.<br />
qualified from experience data<br />
base, subject to proper<br />
anchorages. Plant walk-down<br />
was carried out by a team of<br />
engineers & specialists from<br />
NPCIL, AERB & <strong>IGCAR</strong>. Seismic<br />
interactions and anchorages<br />
were studied. The findings of<br />
the walk-down have been<br />
reviewed by the AERB Review<br />
Committee. The walk-down<br />
revealed several areas where<br />
proper anchorages are<br />
required, and areas where<br />
seismic house-keeping is called<br />
<strong>for</strong> to avoid seismic interaction.<br />
Seismic house-keeping has<br />
been completed in zero level of<br />
RCB.<br />
The results of the analysis of<br />
the SSC and of the qualification<br />
tests of components in the<br />
shake table will be submitted to<br />
the Review Committee. Retrofitting<br />
measures, if required,<br />
will be taken up based on the<br />
recommendations of the Review<br />
Committee. The seismic<br />
anchorages will be modified<br />
wherever required, based on<br />
the findings of the plant walkdown<br />
and comments of the<br />
Review Committee. These are<br />
the minimum required <strong>for</strong> plant<br />
relicensing.<br />
Fig.2 Review basis ground motion<br />
Several<br />
components<br />
have been<br />
identified as<br />
g e t t i n g<br />
Finally, system modeling,<br />
capacity assessment of<br />
components and seismic<br />
margin of the plant will be<br />
assessed as a research activity.<br />
6 FAST BREEDER TEST REACTOR