05.03.2014 Views

addressing uncertainty in oil and natural gas industry greenhouse

addressing uncertainty in oil and natural gas industry greenhouse

addressing uncertainty in oil and natural gas industry greenhouse

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix C<br />

OPERATING CONDITIONS, INSPECTION, CALIBRATION<br />

AND EXPECTED UNCERTAINTIES FOR COMMON FLOW METERS (cont<strong>in</strong>ued) a<br />

METER TYPE MEDIUM OPERATING CONDITIONS INSPECTION & CALIBRATION UNCERTAINTY b<br />

Venturi meter<br />

Gas <strong>and</strong><br />

Liquid<br />

− No corrosive <strong>gas</strong>es <strong>and</strong> liquids − Annual calibration: pressure<br />

transmitter<br />

− 20-100% of the<br />

measurement range: 1.5%<br />

(Expected life span: 30<br />

years)<br />

− Calibration: entire measurement<br />

<strong>in</strong>strument – once per 5 year<br />

− Annual: visual <strong>in</strong>spection<br />

− Annual ma<strong>in</strong>tenance accord<strong>in</strong>g to<br />

general <strong>in</strong>structions for<br />

measurement pr<strong>in</strong>ciple<br />

Ultrasonic meter<br />

(Expected life span: 15<br />

Gas <strong>and</strong><br />

Liquid<br />

− Transducer assembly to be<br />

replaced accord<strong>in</strong>g to the<br />

manufacturer’s specifications<br />

− Clean<strong>in</strong>g: once per 5 years,<br />

recalibration <strong>and</strong> adjust<strong>in</strong>g, if<br />

necessary<br />

− 1-100% of the measurement<br />

range: 0.5%<br />

years)<br />

− No disturbances <strong>in</strong> frequencies − Annual <strong>in</strong>spection<br />

− Composition of flow<strong>in</strong>g<br />

medium should be known<br />

o Contact between transducer<br />

<strong>and</strong> tube wall<br />

− Ultrasonic meters guidel<strong>in</strong>es: o Wall corrosion<br />

Vortex meter<br />

(Expected life span: 10<br />

years)<br />

o<br />

M<strong>in</strong>imum of 10D free <strong>in</strong>put<br />

flow length before the<br />

meter, <strong>and</strong><br />

o M<strong>in</strong>imum of 5D after the<br />

meter<br />

Gas − Set-up is free of vibration<br />

− Avoid compressive shocks<br />

− Vortex meters guidel<strong>in</strong>es:<br />

o M<strong>in</strong>imum of 15D free <strong>in</strong>put<br />

flow length before the<br />

meter, <strong>and</strong><br />

o<br />

M<strong>in</strong>imum of 5D after the<br />

meter<br />

−<br />

−<br />

−<br />

−<br />

o Transducers<br />

Annual ma<strong>in</strong>tenance accord<strong>in</strong>g to<br />

<strong>in</strong>structions of manufacturer/<br />

general <strong>in</strong>structions measurement<br />

pr<strong>in</strong>ciples<br />

Clean<strong>in</strong>g: once per 5 years,<br />

recalibration <strong>and</strong> adjust<strong>in</strong>g, if<br />

needed<br />

Annual <strong>in</strong>spection of: sensors,<br />

bluff body, <strong>and</strong> wall corrosion,<br />

Annual ma<strong>in</strong>tenance accord<strong>in</strong>g to<br />

general <strong>in</strong>structions for<br />

measurement pr<strong>in</strong>ciple<br />

a Based on material presented <strong>in</strong> the ETSG, July 2007 document <strong>and</strong> the sources cited with<strong>in</strong><br />

b<br />

R<strong>and</strong>om errors are based on experience of operat<strong>in</strong>g the respective flowmeters under designated <strong>in</strong>stallation, operation, calibration, <strong>in</strong>spection <strong>and</strong> ma<strong>in</strong>tenance procedures.<br />

−<br />

10-100% of the<br />

measurement range: 2%<br />

Pilot Version, September 2009 C-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!