05.03.2014 Views

addressing uncertainty in oil and natural gas industry greenhouse

addressing uncertainty in oil and natural gas industry greenhouse

addressing uncertainty in oil and natural gas industry greenhouse

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix F<br />

UNCERTAINTY ESTIMATION DETAILS FOR AN EXAMPLE INVENTORY<br />

As stated <strong>in</strong> Section 5.0, this Appendix provides the source-by-source calculation <strong>and</strong> aggregation of<br />

<strong>uncerta<strong>in</strong>ty</strong> for a hypothetical facility. 7<br />

The follow<strong>in</strong>g summarizes the characteristics of the onshore <strong>oil</strong> field example facility <strong>in</strong>troduced <strong>in</strong><br />

Section 5. This example field is described <strong>in</strong> detail <strong>in</strong> the API Compendium (API, 2009). The calculation<br />

exhibits that are repr<strong>in</strong>ted directly from the API Compendium but have additional <strong>uncerta<strong>in</strong>ty</strong> <strong>in</strong>formation<br />

added, are <strong>in</strong>dicated by the highlighted text. Excerpts of Tables 5-1 <strong>and</strong> 5-2 are provided to reiterate<br />

<strong>in</strong>formation used <strong>in</strong> the <strong>uncerta<strong>in</strong>ty</strong> calculations.<br />

Facility Description: An onshore <strong>oil</strong> field <strong>in</strong> Texas consists of 320 produc<strong>in</strong>g <strong>oil</strong> wells.<br />

Throughput: The average daily <strong>oil</strong> <strong>and</strong> <strong>gas</strong> production rates are 6,100 bbl/day <strong>and</strong> 30×10 6 scf/day,<br />

respectively.<br />

Operations: The facility operates approximately 343 days per year. The facility imports 917 MW-hr from<br />

the eGRID subregion ERCOT all annually. The facility <strong>gas</strong> composition is presented <strong>in</strong> Table F-1 <strong>and</strong><br />

results <strong>in</strong> a heat<strong>in</strong>g value of 928 Btu/scf with an <strong>uncerta<strong>in</strong>ty</strong> of ±4%, based on eng<strong>in</strong>eer<strong>in</strong>g<br />

judgment.<br />

Table F-1. Gas Composition for Onshore Production Platform<br />

(Repr<strong>in</strong>ted from the API Compendium)<br />

Gas Compound Produced Gas Mole %<br />

Uncerta<strong>in</strong>ty a<br />

(±%)<br />

CO 2 12 4<br />

N 2 2.1 4<br />

CH 4 80 4<br />

C 2 H 6 4.2 4<br />

C 3 H 8 1.3 4<br />

C 4 H 10 0.4 4<br />

Footnote:<br />

a Uncerta<strong>in</strong>ty is based on eng<strong>in</strong>eer<strong>in</strong>g judgment at a 95% confidence <strong>in</strong>terval.<br />

Note: the values shown above are for example only. They do not reflect average operations.<br />

7 Note, the calculations shown <strong>in</strong> this Appendix are rounded to three significant figures. Actual calculations were<br />

compiled <strong>in</strong> a spreadsheet with round<strong>in</strong>g reserved for the f<strong>in</strong>al results.<br />

Pilot Version, September 2009 F-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!