05.03.2014 Views

addressing uncertainty in oil and natural gas industry greenhouse

addressing uncertainty in oil and natural gas industry greenhouse

addressing uncertainty in oil and natural gas industry greenhouse

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table F-15. Onshore Oil Field (High CO 2 Content) Emissions<br />

CO 2 CH 4 N 2 O <strong>and</strong> Other GHG Total Emissions, CO 2 Eq<br />

Source Type<br />

Combustion<br />

Sources<br />

Vented sources<br />

Uncerta<strong>in</strong>ty<br />

Emissions %<br />

(tonnes/yr) Lower Upper<br />

Uncerta<strong>in</strong>ty<br />

Emissions %<br />

(tonnes/yr) Lower Upper<br />

Uncerta<strong>in</strong>ty<br />

Emissions %<br />

(tonnes/yr) Lower Upper<br />

Uncerta<strong>in</strong>ty<br />

Emissions %<br />

(tonnes/yr) Lower Upper<br />

Source<br />

B<strong>oil</strong>er/heaters 5,200 8.78 8.78 0.0865 26.1 26.1 0.0242 100 150 5,210 8.77 8.77<br />

Natural <strong>gas</strong> eng<strong>in</strong>es 13,900 15.7 15.7 0.904 29.4 29.4 0.325 100 151 14,100 15.6 15.6<br />

Emergency generator IC<br />

eng<strong>in</strong>e<br />

219 15.6 15.6<br />

0.0108 27.8 27.8 0.00175 100 151<br />

220 15.5 15.5<br />

Fire water pump IC eng<strong>in</strong>e<br />

0.00112 100 106 0.0000467 100 151<br />

Flares 27,400 23.4 23.4 153 25.3 25.3 0.223 100 200 30,700 21.1 21.1<br />

Fleet vehicles 127 19.4 19.4 0.00643 100 151 0.00871 100 151 129 19.1 19.2<br />

Combustion Total 46,800 14.5 14.5 154 25.2 25.2 0.582 68.9 114 49,900 13.7 13.7<br />

Dehydration <strong>and</strong> Kimray<br />

pump vents<br />

105 77.5 77.5 254 77.5 77.5 NA NA NA 5,440 76.0 76.0<br />

Tanks – flash<strong>in</strong>g losses 775 90.4 90.4 1,880 90.4 90.4 NA NA NA 40,300 88.7 88.7<br />

Am<strong>in</strong>e unit 62,600 6.97 6.97 193 100 119 NA NA NA 66,700 8.94 9.77<br />

Pneumatic devices 64.6 50.2 50.2 157 50.2 50.2 NA NA NA 3,360 49.2 49.2<br />

Chemical <strong>in</strong>jection pumps 48.6 100 108 118 100 108 NA NA NA 2,530 98.1 106<br />

Vessel blowdowns 0.0702 100 326 0.171 100 326 NA NA NA 3.65 98.1 319<br />

Compressor starts 0.745 100 190 1.81 100 190 NA NA NA 38.7 98.1 187<br />

Compressor blowdowns 0.333 100 179 0.808 100 179 NA NA NA 17.3 98.1 175<br />

Well workovers 0.0181 100 300 0.0439 100 300 NA NA NA 0.939 98.1 294<br />

Other non-rout<strong>in</strong>e (PRVs) 0.131 100 310 0.318 100 310 NA NA NA 6.81 98.1 319<br />

Vented Total 63,600 6.95 6.95 2,610 66.3 66.5 NA NA NA 118,000 30.9 31.0<br />

Pilot Version, September 2009 F-38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!