05.03.2014 Views

addressing uncertainty in oil and natural gas industry greenhouse

addressing uncertainty in oil and natural gas industry greenhouse

addressing uncertainty in oil and natural gas industry greenhouse

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EXHIBIT 4-5: Uncerta<strong>in</strong>ty Example for Multiple Flow Measurements, cont<strong>in</strong>ued<br />

Table 4-7. Uncerta<strong>in</strong>ty <strong>in</strong> Summation of Flow Measurements - Annual<br />

Assigned Context<br />

Specific Uncerta<strong>in</strong>ty, %<br />

Annual Measurement<br />

Total Uncerta<strong>in</strong>ty<br />

(absolute), 10 3 scf<br />

Annual Measurement<br />

Flow Rate<br />

Uncerta<strong>in</strong>ty, %<br />

10 133,947 11.28%<br />

25 303,257 25.54%<br />

100 1,189,036 100.14%<br />

As with the annual volume, the uncerta<strong>in</strong>ties associated with the meter (1.5%), the context-specific factors<br />

(assigned 10%, 25%, <strong>and</strong> 100% to exam<strong>in</strong>e the sensitivity of this <strong>uncerta<strong>in</strong>ty</strong>), <strong>and</strong> bias (5%) apply to the<br />

daily read<strong>in</strong>gs <strong>and</strong> monthly totals. Summ<strong>in</strong>g the daily flow rates for the monthly totals results <strong>in</strong> the same<br />

relative uncerta<strong>in</strong>ties as shown <strong>in</strong> Table 4-6. Table 4-8 summarizes the absolute uncerta<strong>in</strong>ties for the monthly<br />

flow rates.<br />

Table 4-8. Uncerta<strong>in</strong>ty <strong>in</strong> Summation of Flow Measurements – Monthly<br />

Monthly Measurement Flow Rate Uncerta<strong>in</strong>ty<br />

Relative Uncerta<strong>in</strong>ty, % 11.28% 25.54% 100.14%<br />

10% 25% 100%<br />

Month MMscf (absolute uncerta<strong>in</strong>ties, 10 3 scf)<br />

January 83.50 9,419 21,325 83,614<br />

February 78.28 8,830 19,991 78,382<br />

March 107.45 12,121 27,442 107,595<br />

April 103.83 11,712 26,516 103,966<br />

May 104.59 11,798 26,712 104,733<br />

June 102.87 11,605 26,273 103,014<br />

July 100.62 11,351 25,699 100,761<br />

August 106.03 11,960 27,078 106,171<br />

September 104.23 11,758 26,620 104,374<br />

October 102.28 11,537 26,121 102,417<br />

November 98.43 11,104 25,139 98,566<br />

December 95.31 10,752 24,342 95,443<br />

4.4.1 Measurement Uncerta<strong>in</strong>ty – Multiple Measurements<br />

Cont<strong>in</strong>u<strong>in</strong>g with the decision tree provided <strong>in</strong> Figure 4-4, where multiple measurement po<strong>in</strong>ts are available,<br />

the correspond<strong>in</strong>g <strong>uncerta<strong>in</strong>ty</strong> can be derived on the basis of a statistical sample. See Cochran, 1977 for a<br />

comprehensive guide to sampl<strong>in</strong>g.<br />

Pilot Version, September 2009 4-21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!