Attachment A. Bid Requirements<br />

Vendor shall provide the following information with their proposals.<br />

1. Company’s resume providing qualifications and references that demonstrate Vendor’s<br />

capability to complete the work.<br />

2. Vendor’s organization chart identifying how this work will be managed as well as interface<br />

points with PEF.<br />

3. Resumes of personnel intended to be used on this project. These resumes will be evaluated<br />

as part Vendor’s qualification to accomplish the stated scope of work.<br />

4. Commitment to start work within ten (10) days of the Notice to Proceed.<br />

5. Company safety statistics.<br />

6. Classification of each type person associated with the work scope.<br />

7. Hourly billing rates for each classification (straight timelovertime or all-hours rate)<br />

8. Billable travel and living expenses.<br />

9. Estimated man-hours for each personnel classification.<br />

10. This contract will be completed as a Time & Materials contract, divided into two phases.<br />

Provide a maximum not-to-exceed contract dollar amount for each phase of the work<br />

described in this RFP.<br />

1 1. Provide a description of the suggested approach the Vendor will take to complete this work.<br />

The approach description should:<br />

be consistent with the estimated cost and schedule,<br />

include the expected manpower (by classification) needed for each phase of the work,<br />

demonstrate that the Vendor understands the work scope & schedule requirements,<br />

identify what work will be completed at Crystal River and the work to be completed at<br />

the Vendor’s facility,<br />

include potential problems that could affect the project cost or schedule,<br />

include methods to control contract costs,<br />

describe the Vendor’s earned value system that will be used to monitor and report project<br />

cost (this description should demonstrate that the Vendor has the capability to properly<br />

identify, monitor, collect, analyze, and report project costs),<br />

identify opportunities to improve the project’s completion.<br />

12. Provide a schedule for accomplishing this scope of work that contains the sequence of<br />

activities in Section VIII.<br />

13. QA/QC Program Manual &/or Procedures to be followed in completing the work.<br />

14. Health & Safety (H&S) Plan or agreement to comply with the PEF’s H&S Plan.<br />

SPECIAL REQUIREMENTS :<br />

Confidentiality:<br />

All RFP drawings, specifications, and contractual documents will remain the property of<br />

Progress Energy and are to be returned in good condition within ten (1 0) days after the date set<br />

PEF-NCR-00596