Page<br />

Crystal River Unit 3<br />

Nuclear Power Station<br />

Replacement Turbine Generator<br />

# Section Reference Table of Conformance - Technical Comments<br />

of 1.6% reactor power is planned during the fall 2007 refueling outage.<br />

Retrofit the low pressure turbines, moisture separator reheaters. generator and<br />

exciter during the fall 2009 refueling . outage - which will begin in September and will<br />

have a duration of approximately 80 days.<br />

Design and retrofit the high pressure turbine during the fall 2011 refueling outage to<br />

support the reactor thermal uprated conditions.<br />

An extended reactor power uprate an additional 15.4% reactor power during the fall<br />

2011 refueling outage.<br />

Total extended power uprae from present will be 17%.<br />

Design life - 40 years.<br />

Provide a proposal for replacement of high pressure and low pressure turbines.<br />

Objective: To obtain a replacement steam path that produces maximum power from<br />

the steam supplied by steam generators after implementation of a 17 percent power<br />

I<br />

P5<br />

I<br />

P6<br />

Doc #250846<br />

4/10/2008