02.06.2014 Views

siemens - Public Service Commission

siemens - Public Service Commission

siemens - Public Service Commission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(IHJ i3dendecl I'ower Ulirate, Secondary Systems Upgrade Bid Proposal 'Technical Evaluation<br />

Pg. 2 of 3<br />

Pg.5. PEPSE ivlvloclcl. xld Y UBA cstiinatcd feedwiirer hentcr TTD's and DCA's for ixtniiiccl<br />

hcntcrs: validarc MLiK PEPSE modcl nguinst plnnt d:ita following MllR implementation. Siemens<br />

will ~~ovidc piclimiiiiiry turbine PEPSF: modcl input in September 2007. PEPSE modcl to hc<br />

iipdutctl with final tiirbiric PEPSE model input uf'ter finul tuibinc dcsign is cqtablished.<br />

Pg.3, FATtIOM model: add Sccondi1i.y Coolins Sysrcin (SC) lo list of systcms. Nccd to vcril'y<br />

iipi-atctl SC sysicin will proviclc sull'icicnt cooling water to specific locutions in the systcrn (it.<br />

Ckncixtor H3 coolers). System flow control viilvcs should be ci:alu~itcd. 'I'he LO C'oolci.<br />

tcinpcnituiv control v;iIvc may necd to he cnlargcd. The SC sysrcrn hcudei. prcssure control<br />

setpoint can I>c inciwscd IO- IS psi duc to inL.irasing the gcncrator H2 gas pressi1i.e I'roni 60 psi: to<br />

75 psiig.<br />

e Pg.0. Corniiicrcial arid Resourcc Pi.oposal: icvicw "hilling in accordance with master service<br />

agiwincnt I'or 'T'&M" vs. thc not lo excccd prices qtiitcd in thc ~~i'upos~ill.<br />

e Pg.10, ltcin 7; CHWWORKS progi'ani at CK3 will he utilized.<br />

e Pg. IO, ltcin 8: Find PWSE inodcl after iill ncw ccluipmcnt is spccified is no1 in scope.<br />

e Pg. IO, Itcin 0; Enercon sitc liaison is expected to ohtiiin dcsign basis iiiI'ormii1ioii. Re1ianc.c on sire<br />

cngincci.ing to proviclc clcsign basis inl'oriiintion is not desired.<br />

e I'g. I I. ltcin 13; l'hc propos;il docs not includc :I PEPSE modcl for the 1000 plant condition. The<br />

2000 plant conl'istii.;ition hciit bnlunce model will be pcrl'ormed by Siemens 1,) support tuibinc<br />

pcifoimuiicc giiariintec and pcrlixmuncc tcsting. Add, "3-wcon shill1 support this el'l'oit iis needed<br />

to accuratcl y niodcl thc plant configuriition". I':vuluate having Encrcon ped'oim an indcpeiidcnt<br />

3000 iriodel to coinpirc with Sicmcns model.<br />

Pg.30. As\;iiniption item 3 iind 4; a11 viilvcs 011 pipinp associated wilh the new MSR belly drain<br />

heat cxchiii1gei.s shiill hc cvduated. New vi11 vc\; shall be specified for procurcnicnl iiowcvci. u<br />

rmcurcmcrit EC s hoii Id not be iqui rci.!<br />

Pi~oposal requii.cs CK3 plant cablc datuhascs uti II he tipdated by plant engineer in$.<br />

Pg.24. 'l'iiibinc Vcntloi. Information; will not be ;IS extensive as describcd in thc propo>ill. 'T'hc<br />

turhiiic vcndoi. will Iwovidc ncw complete tul-hinc gcncrutor instruction manuals iind the turbine<br />

gcnciuloi. inst:illalion instructions. Thc cxistirig turhine generator vendor diawirig file will haix to<br />

hc icvicwcd for impuct. A turbine pei.forinancc lest procedure shall he dcvclopcd ilnd sholl he in<br />

accorduncc with ASME PTC 6 - 2004, Alteimutc tcst for nuclcur plant.<br />

Pg.3-8, Ttiilinc Cicncraloi. Assumptions The SC piping to thc generator H3 cooIci.s niay he<br />

impacted: Turbine Cieneraror inslriimcnt and conrrol sctting chaiigcs will he pivviiied hy Sicmcns<br />

and shiill bc incluclcd in the turbinc EC': Genei'ator Instrumcnts will he impacred arid shall he<br />

cvaluatctl: Tiiihnc (icncixlor siipporl systems will hc evaluated by Sicmcns. Any inipacr.;<br />

idciitil'icd hy Siciiieiis shall bc included in the riii.biiic EC.<br />

Pg.70, 'l-iiilinc Gcnci.atoi' Assumptions 17: (.d~liliiti(>n SOS-002 I. Turbine Gciici:iloi. f'cdcslul<br />

Stiuciui'al Analysis. shdl bc "iipdiited" using the incthodology contained in tlic ;inaly;i\. A thiw<br />

diniciisionnl milysis modcl ot the tuibinc pctlcsrnl slructurc is included.<br />

e Pg.39, Bus Duct Dclivcixbles: Vci.iI'y cvdualion ol' bus duct clccti.iciil c;ipiiciry (hiis clui't rarinp)<br />

will tic pcifoimxl in con.junction with thc hirs (Iiicr cooling EC.<br />

e Pg.70. SC Systcin Workscope Item IO: Vcril'y Iiydixiilic evaluation incluclcs hylcin I'lon biil;incc.<br />

systcni tical lo~i(lh i i i sutisl'icd ~ and sysreiii tlo~+. conliul vi11 vcs aic cvaliiatcd. Nc\te thc SV \ystcin<br />

pi.c?;surc scrpoinl c;iii hc inci-eascd diic 10 iricrcahing genei.aloi. H1 picssiii'c.<br />

Pg.50. SC' Systcrn Workscqx Item I I . 7'hc ttiihiic IuIw oil tcmpci'atiii'c coiitir)l ~nI\c: \hoiild he<br />

i~cplx~cd with ;I 1iiiyc.i. v;iIvc.<br />

PET-NCR-0 1654

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!