a Pg. 2 of 3<br />

Turbine Testing: Proposal pricing includes<br />

r ASME PTC 6 turbine Derformance testing. Following<br />

discussion the prevailing approach is not to perform a full ASME PTC 6 performance test. Consideration is to<br />

use the PTC 6 - 2004 Atemate Test. Key parameters will be megawatt output and reactor thermal. PE will<br />

have high accuracy instruments for feedwater flow, main steam pressure, main steam RTD’s, condenser back<br />

pressure and high accuracy megawatt meters. This approach will reduce the price by the amount included to<br />

perform the full PTC 6.<br />

Performance bonus / penalty clause should have a performance dead band. Review dollars tied to performance<br />

testing result. The fact that the multiple changes to the plant will make exact megawatt contribution from a<br />

single source difficult to evaluate. A deadband of +/- 0.7% (test accuracy) has been discussed as an amount to<br />

account for these uncertainties and then a bonus could be considered for megawatts achieved above that value.<br />

Siemens to review tbe following conceptslissnes:<br />

Is replacement of the generator WTA voltane remlator required to support the 1200MVA generator rating<br />

excitation requirements? WTA power amp drawers are uprated from 200 amps to 300 amps. Are the power<br />

amp drawers fully redundant at 300 amps? Siemens to unbundle the Digital Voltage Regulator and price it<br />

semrately. Provide basis for recommending the EM1 I RFI hardened cabinets. Verify the estimated cost for<br />

~&cluding~ation<br />

- 3 - I- and startup support.<br />

-<br />

istinn nenerator rotor<br />

ens. Transportation costs are included in the current price to<br />

return the-existing CR3 generator rotor back to Charlotte. The Shipping and Handling estimated cos~ate<br />

high. Heavy hauling on site is largest cost portion. Agree to review transportation and handling plan. Evaluate<br />

Mammoat (bundled contract) for on site heavy hauling.<br />

The final Secondary Plant design configuration must be provided to Siemens to support turbine blade path<br />

design. This includes the MSR drains re-route and feed water heater specifications. Siemens to provide a date<br />

when the information is needed for the final turbine steam path design.<br />

Siemens to evaluate the rem<br />

basis for this cost<br />

re-consider the m<br />

peripherals and include as baseline to the overa!! project.<br />

~.<br />

and support systems for EPU impact. The<br />

o perform the study. PE requests Seimens to<br />

er work required to define the turbine<br />

Provide basis for consideration of adding thegenerator “Performance Plus H2 Seal Package” to proposal.<br />

Document advantages / benefits associated Vtith this seal package. Provide a list of users with large<br />

generators equipped with performance plus seal insta!led.<br />

Siemens will provide dehumidification for generator and no delays of high pot testing due to winding<br />

moisture. Electrical Power required for generator core iron loop test wil be by PE.<br />

..’<br />

I<br />

erator instnunentation will include h’tallation of two flux probes, fiber optic vibration probes and 24 Gas<br />

charge R7’D’s With new terminal bods. Flux probes and fiber optic vibration pickups will be monitored<br />

using portable test equipment. Include providing the required portable test equipment for monitoring. Partial<br />

discharge slot coupler pickups are not required.