Progress Energy Crystal River Unit 3<br />

Request for Proposal for Engineering <strong>Service</strong>s to Upgrade Secondary System<br />

612512007<br />

1.9.2 MSR Replacement and MSR Belly Drain Heat Exchanger Addition<br />

MSR Replacement<br />

The turbine rotor supplier is providing new moisture separator reheaters. An<br />

engineering change package is required to be prepared to support installation of the new<br />

MSRs. As part of the task of preparing the EC package, evaluation of the MSR relief<br />

valves is required. Procedure EGR-NGGC-0005, Engineering Change applies is this<br />

task.<br />

MSR Belly Drain Heat Exchanger Addition<br />

Current CR3 plant configuration dumps the MSR belly drains directly to the condenser.<br />

This design negatively impacts plant efficiency because a significant amount of energy is<br />

dumped to the condenser. The BOP efficiency can be improved and energy recaptured<br />

by installing heat exchangers in the MSR drains. It is expected that approximately 4<br />

MWe will be gained in generator output. The figure below illustrates the concept of<br />

recapluring the energy in the MSR belly drains before dumping to the condenser.<br />

MSR Belly Draln Flow Diagram<br />

The existing MSRs are not adequale for 3030 MWt and are being replaced. The<br />

preliminary PEPSE model for 3030 MWI indicates lhat the MSR shell drain flow is<br />

expected lo increase from 11% to 13% with a temperature increase to 392 'F from 377<br />

23<br />

PEF-NCR-0 1989