Siemens Contract Negotiations<br />

05103107<br />

Those in attendance were:<br />

Tony Owens<br />

Scott Deahna<br />

Ted Williams<br />

Mike Morin<br />

Dan Smith<br />

Mike O'Leary<br />

Shay Foley<br />

Kebris Miller<br />

AI Batista<br />

Puneet Bahl<br />

Steve Blevins<br />

Don DiAntonio<br />

HPT should be acceptable for 2009-201 1. All components can meet 1165MVA based on current<br />

installed.<br />

Major Components core iron, stator, exciter, rotor can meet 1200 MVA. Other Aux. components<br />

are under evaluation e.g. H2 gas cooler. Can scope prior to avoid. Blower should be OK by may<br />

need to be modified. Bushings need to determine by June 8'.<br />

0 -<br />

Need to identify critical path efficiencies. Challenge 69 day duration target 58 days. Can a<br />

midsection replacement be estimated?<br />

Use 95'F for the gas SC Cooling<br />

Siemens Engineering Comments<br />

Turbine Rotor weight and TEGO Babbit.<br />

Installed on similar type frame supports.<br />

Babbit will support higher loads and temps. No new bearings required if needed will be included<br />

by Siemens not PGN.<br />

Generator frame design can meet 75 psig requirement. Original design 60 psig. Seal oil system<br />

Mods are included in base price.<br />

Laser alignment of LPT Included<br />

Gen Alignment should be included<br />

HP needs to be checked<br />

New Canto nary Curves will require alignment<br />

Generator exciter front foot alignment.<br />

300 amp rating power amp drawers need to be verified @ 1200 MVA and single failure capability<br />

to carry full excitation.<br />

Do not anticipate TGV control problems with full arc control.<br />

Need generator Neutral analyzed for shorts transients. Protective relay set points will be provided.<br />

I'EF-NCR-00774