Appendix B program.<br />

The technical details and requirements for each of the items associated with this scope of work<br />

are discussed in the following sections.<br />

111. Owner Scope of Work<br />

PEF personnel will work with the selected Vendor in obtaining additional information (e.g.,<br />

wetland surveys, civil engineering drawings, and plant electrical drawings) to support the<br />

evaluation. The selected Vendor should expect a one day turn around time for on site delivery of<br />

drawings and an additional one to two days time for off site delivery. PEF personnel will<br />

coordinate the Vendor’s CR site indoctrinations, badging, and specific training, as required.<br />

After the Phase I altemative selection, an economic analysis will be performed using PEF’s inhouse<br />

EESY+ software. PEF will input the Vendor’s supplied data into EESY+ and provide the<br />

output results for incorporation into the final study report. The Vendor will review the EESY+<br />

input for accuracy and review/incorporate the output results into the study.<br />

IV. Technical Details<br />

Vendor shall conduct a thorough review of design altematives to reduce the discharge canal<br />

water temperature and satisfy the stated Project objectives following CR3’s EPU. This<br />

evaluation shall include a technical analysis of design variables such as discharge canal<br />

temperature variation, ambient temperatures, and environmental restrictions. Specific data<br />

related to the unit operations following the EPU are included below. Additional information will<br />

be supplied by PEF after contract award and requested by the selected vendor.<br />

0 CRl full-load operation<br />

s 245,000 gpm Circulating Water Flow (actual)<br />

a -I 7 OF Circulating Water Temperature Rise Through Condenser<br />

0 CR2 full-load operation<br />

a 308,000 gpm Circulating Water Flow (actual)<br />

s -14 OF Circulating Water Temperature Rise Through Condenser<br />

0 CR3 full-load operation<br />

s 832,000 gpm Circulating Water Flow<br />

s -1 7 OF Circulating Water Temperature Rise Through Condenser<br />

s .768 MBtuhr of Additional Heat Dissipated due to EPU<br />

0 (Hamon) Helper Cooling Towers operation .<br />

3 4 blocks of 9 cells<br />

3 686,000 gpm Total Water Flow<br />

a 89.5 OF Design Outlet Temperature (based on 103 OF inlet and 81 OF wet bulb)<br />

(Aggreko) Modular Cooling Tower operation<br />

s 67 individual cells<br />

s 180,000 gpm Total Water Flow<br />