place in the proposal at the expense of some (but not excessive) redundancy if necessary.<br />

d.<br />

Answer all questions proposed by PE. The response to each question shall be cross-referenced to the<br />

Bidder's proposal where applicable.<br />

e, Bidder shall acknowledge that discounts provided by hardware suppliers to Bidder, at the time of<br />

submitting Bidder's proposal, shall also apply tothe actual hardware that will ultimately be furnished PE,<br />

regardless of size or quantity. Further, in the event any greater discounts are received by Bidder at the<br />

time of delivery, Bidder shall proportionally pass such discounts on to PE.<br />

f. Provide a preliminary milestone schedule for accomplishing this work.<br />

SPECIAL REOUIREMENTS:<br />

Familiaritv with Laws:<br />

The Bidder is assumed to be familiar with all federal, state, and local laws, ordinances, and regulations which may<br />

in any manner affect those engaged or employed in the work, the materials or equipment in the work or the conduct<br />

of the work. PE should be immediately contacted for clarification if a bidder should discover provisions in any<br />

drawings, specifications or contractual documents contrary to or inconsistent with any such law, ordinance or<br />

regulation.<br />

Confidentialitv:<br />

0<br />

All drawings, specifications, and contractual documents will remain the property of Progress Energy and are to<br />

be returned in good condition within ten (1 0) days after the date set for receiving bids. These documents shall<br />

not be reproduced or used for any purpose other than for the preparation of a proposal in accordance with this<br />

request. The information contained in these documents is proprietary and confidential and shall be maintained<br />

in strict confidence.<br />

Interpretat ion:<br />

An interpretation request shall be made to Progress Energy ifa bidder is in doubt as to the true meaning ofany<br />

part of the drawings, specifications, or contractual documents. Modification of the documents will be made<br />

only by written addendum issued to each bidder as described below.<br />

Exceptions:<br />

If a bidder's proposal contains any deviations or exceptions, those deviations or exceptions must be specifically<br />

identified either in the Table of Conformance or on a single separate attachment to the proposal in order to be<br />

considered in the evaluation. If not so identified, the deviations or exceptions will not be considered part of the<br />

proposal. Conditional proposals based on bidder-generated clarifications may not be accepted. If a bidder<br />

takes any exceptions in addition to those submitted in accordance with this section, that bidder's proposal may<br />

be rejected by Progress Energy.<br />

Sample contract documents are not included for bidders possessing a Master Contract with Progress Energy.<br />

All other bidders, if successful, will review and redline the enclosed SAMPLE contract format. Any<br />

exceptions to the contract documents must accompany the proposal as detailed above and the exceptions will<br />

be considered in the bid evaluation process.<br />

Approved Eaual Evaluation:<br />

Submittals by bidders for evaluation of products as "approved equal" shall be made to the appropriate<br />

6<br />

PEP-NCR-0 1958