Section Referena<br />

Crystal River Unit 3 Nuclea<br />

xtended Power Uprate Bid Specification<br />

of Conformance - Technical<br />

Table<br />

1 1 . 1 I<br />

IIII<br />

--<br />

I<br />

Prepare an EC to replace the piping upstream of Heater Drain Valves HDV-<br />

247. -248. -249, and -250 with piping with a higher pressure and temperalure<br />

rating<br />

Secondary <strong>Service</strong>s Closed Cycle Coollng System Modifications<br />

0 Perform an evaluation to determine the maximum capacity and cooling flow of<br />

the Secondary Cooling Heat Exchangers based on existing space limitations.<br />

Perform an evaluation to determine the maximum Row by replacing the SC pump<br />

impellers and motors<br />

0 Prepare a new specification for the Secondary Cooling Heat Exchangers 1A<br />

and 18<br />

0 Prepare an EC to purchase two new SC heat exchangers<br />

0 Prepare an EC to install two new SC heat exchangers<br />

0 Revise Secondary Cooling pumps and motors. SCP-1A and -16 specification<br />

Prepare an EC to purchase two new SC pump impellers and motors<br />

0 Prepare an EC to install two new SC pump impellers and motors<br />

Circulating Water System Modifications<br />

0 Revise specification for Circulating Water Dumps and motors CWP-1A -16.<br />

1C. and -1D to achieve a nominal flow of 207,400 gpm<br />

0 Prepare an EC to purchase four new CW pump impellers and motors<br />

-<br />

Comments<br />

I I I I 0 Prepare an EC to install four new CW pump impellers and mot06 and uwrade I I<br />

the cirwiatina water svstem exnansion iointiat the condenser as reauired I I<br />

I<br />

Revise swcification for the Condensate Dum= and motors. CDP-IA and -16 I I<br />

Condensate pumps and motors<br />

to achieve the required flow for EPU conditonsinduding incorporation of variable<br />

speed drives and compatible condensate flow control<br />

0 Prepare an EC to purchase two new CD pump impellers and motm equipped<br />

with variable speed drives<br />

Prepare an EC to install two new CD pump impellers. motors and the<br />

associated variable speed drives<br />

Feedwater Booster pumps and motors<br />

0 Revise specification for the Feedwater Booster pumps and motors. FWP-1A<br />

and -18 to achieve the required flow for EPU conditions including increasing the<br />

flow margin to 10%<br />

0 Prepare an EC to purchase two new feedwater booster pumps and mo:ors<br />

0 Prepare an EC to install hrro new feedwater booster pumps and motors<br />

Feedwater Control Valves and Feedwater Control System Stability<br />

0 Perform an evaluation lo determine if the feedwater control valves and<br />

feedwater control system are stable under EPU conditions<br />

Condenser<br />

Condud an update to existing condenser performance and Row-induced<br />

vibration calculations. This shall also include an evaluation of waterbox<br />

temperature limits and shielding designs for internal components. The update is<br />

to be subcontracted to Heat Exchanger <strong>Service</strong>s<br />

Electrical Distribution Calculations<br />

I<br />

Oocm-<br />

“7<br />

2