Crystal River Unit 3<br />

Nuclear Power Station<br />

Replacement Turbine Generator<br />

Table of Conformance - Technical<br />

Comments<br />

Furnish and deliver all spare parts required during construction.<br />

Shipment to the job site shall be the responsibility of the Seller.<br />

SCOPE OF SUPPLY BY OTHERS<br />

Access to Systems Design Information: Identification of the required information is<br />

the Sellets responsibility.<br />

Purchaser shall receive or duplicate necessary documents such as drawings,<br />

procedures, specifications, etc.<br />

Modifications to existing mechanical systems, components, including piping and<br />

hangers as required for the new installation.<br />

Modifications to existing turbine control systems, instrumentation and electrical<br />

systems as required for compatibility with replacement equipment. Owner shall<br />

describe any such modifications as described in Section 1.7.5.<br />

Modifications to existing generator interface systems and equipment such as<br />

generator cooling water supplies, generator busses, generator breakers, main<br />

transformers and protective relaying as required for compatibility with replacement<br />

equipment.<br />

Any existing parts that require replacement as a result of disassembly of the<br />

existing components for final installation will be supplied by the Owner.<br />

Disposal of removed components that shall not be reused.<br />

Operation personnel to perform shutdown, startup, draining, filling, isolation. and<br />

other normal system operating functions.<br />

Safety clearance and tagging of all equipment.<br />

Removal, inspection, and installation of instrumentation.<br />

Electric power, lighting, water, compressed air, and overhead crane facilities.<br />

Removal and installation of insulation.<br />

All electrical disconnects and terminations required to perform work.<br />

Construction and removal of scaffolding.<br />

Radiation protection technicians if required.<br />

Unescorted access training for Contractor's personnel.<br />

Preparation of post installation test procedures.<br />

Supply of test instrumentation.<br />

Performance of post installation tests and preparation of associated test reports.<br />

SCOPE OF SERVICES<br />

Design, fabrication, shipping, inspection and factory testing of equipment, including<br />

implementation of Quality Control procedures to ensure completed equipment<br />

satisfied the specification and design requirements.<br />

Factory assembly of stationary components to validate dimensional and<br />

configuration interface with retained systems, structures and components.<br />

Doc #E0846<br />

4/10/2008 P = Paragraph No PEF-NCR-0 1296 12