- Page 1 and 2:
EXAMPLE August 23,2007 Mr. Jim Gann
- Page 3 and 4:
TABLE OF CONTENTS Cover Letter & In
- Page 5 and 6:
GENERAL INFORMATION In the evcnt th
- Page 7 and 8:
SCOPE AND OTHER REQUIREMENTS I. Bac
- Page 9 and 10:
Appendix B program. The technical d
- Page 11 and 12:
Telephone: Email: (352) 795-0504 x6
- Page 13 and 14:
Summary Report. lhe selected Vendor
- Page 15 and 16:
limitations. Identify the fire prot
- Page 17 and 18:
for receiving bids. WP documents sh
- Page 19 and 20:
Attachment B. Alternatives Analysis
- Page 21 and 22:
PEF Safety Plan PEF-NCR-0060 1
- Page 23 and 24:
TABLE OF CONTENTS SECTION PAGE 1.0
- Page 25 and 26:
1.0 PURPOSE This procedure provides
- Page 27 and 28:
2.0 REFERENCES 2.46 2.47 2.48 2.49
- Page 29 and 30:
4.0 RESPONSIBILITIES 4.1 Site Vice-
- Page 31 and 32:
9.3 General Rules 9.3.5 Red and bla
- Page 33 and 34:
9.4 Personal Safety Protection 9.4.
- Page 35 and 36:
~~ 9.5 Hearing Conservation 9.5.1 9
- Page 37 and 38:
9.9 Lead 9.9.1 Lead removal shall b
- Page 39 and 40:
9.14 Handling, Use, and Storage of
- Page 41 and 42:
9.17 Fall Protection 9.17.1 Fall pr
- Page 43 and 44:
9.19 Scaffolding 9.19.1 All scaffol
- Page 45 and 46:
9.23 Compressed Air Use 9.23.3 Job-
- Page 47 and 48:
9.29 Job Safety Analysis 9.29.1 Job
- Page 49 and 50:
ATTACHMENT 1 Sheet 2 of 5 29 CFR 19
- Page 51 and 52:
ATTACHMENT 1 Sheet 4 of 5 29 CFR 19
- Page 53 and 54:
ATTACHMENT 2 Sheet 1 of 5 HNP Perso
- Page 55 and 56:
ATTACHMENT 2 Sheet 3 of 5 HNP Perso
- Page 57 and 58:
191 0.1 36 FOOT PROTECTION ATTACHME
- Page 59 and 60:
ATTACHMENT 3 Sheet 2 of 5 RNP Perso
- Page 61 and 62:
ATTACHMENT 3 Sheet 4 of 5 RNP Perso
- Page 63 and 64:
ATTACHMENT 4 Sheet 1 of 2 HE&EC Per
- Page 65 and 66:
ATTACHMENT 5 Sheet 1 of 5 CR3 Perso
- Page 67 and 68:
ATTACHMENT 5 Sheet 3 of 5 CR3 Perso
- Page 69 and 70:
1910.136 FOOT PROTECTION ATTACHMENT
- Page 71 and 72:
ATTACHMENT 6 Sheet 2 of 2 NGG Hazar
- Page 73 and 74:
~~ ATTACHMENT 8 Sheet 1 of 1 Person
- Page 75 and 76:
~~ ____ Section Description of Chan
- Page 77 and 78:
Site Land Use Classification Map PE
- Page 79 and 80:
Applicable Sections of the Site Cer
- Page 81 and 82:
June 2007 2-2 0738953 1 limits the
- Page 83 and 84:
June 2007 1 0738953 SECTION 3 3.0 T
- Page 85 and 86:
June 2007 3-2 0738953 1 3.1.1 Descr
- Page 87 and 88:
June 7007 3 -4 0738953 I 3.4 Air Em
- Page 89 and 90:
June 2007 3 -6 073899 1 emission ra
- Page 91 and 92:
June 2007 3-8 0738953 I designed to
- Page 93 and 94:
June 2007 3-10 0738953 1 1 1.4 perc
- Page 95 and 96:
June 2007 I 0738953 1 SECTION 5 5.0
- Page 97 and 98:
June 2007 5- 1 0738953 1 5.0 EFFECT
- Page 99 and 100:
June 2007 5 -3 0738953 I 5.1.3 Biol
- Page 101 and 102:
Figure 2.3.4-5 Once Through Cooling
- Page 103 and 104:
Helper Cooling Tower Performance Cu
- Page 105 and 106:
Modular Cooling Tower Performance C
- Page 107 and 108:
Local Annual Windrose
- Page 109 and 110:
5/24/2007 2 3 7-2 TPA Winter Windro
- Page 111 and 112:
5/24/2007 2.3.7-4 TPA Surnrner Wind
- Page 113 and 114:
RFI Number: Discharge Canal Thermal
- Page 115 and 116:
Inhattsverzeichnis I Table of conte
- Page 117 and 118:
Qu alitats p r u f blattlQuality Te
- Page 119 and 120:
Qualit~tsprufbla~Quality Test Sheet
- Page 121 and 122:
Kennwort: Job "0: AuRrags-N.: etm m
- Page 123 and 124:
QualitSts pr UfblatUQuality I Test
- Page 125 and 126:
SIEMENS McdernaalKm prolecf CONFIDE
- Page 127 and 128:
SUSQUEHANNA STEAM ELECTRIC STATION
- Page 129 and 130:
OTHER LONG TERM RELIABILITY ISSUES
- Page 131 and 132:
Figure 1 -Advanced Disc Design LP T
- Page 133 and 134:
stainless steel inner casing constr
- Page 135 and 136:
Figure 2 - HP Turbine Comparison (U
- Page 137 and 138:
~ ~~ SCOPE OF SUPPLY - HARDWARE SIE
- Page 139 and 140:
SIEMENS CONF Mdernaalion Roied PAGE
- Page 141 and 142:
SIEMENS co ~N FI DENTI At DO USE 7H
- Page 143 and 144:
SIEMENS Modernnation Prolect ADril
- Page 145 and 146:
SCOPE OF SUPPLY - HARDWARE SIEMENS
- Page 147 and 148:
SIEMENS co Modernizetion Proled ..
- Page 149 and 150:
Moderncalfon Pmpd PAGE5 SCOPE OF SU
- Page 151 and 152:
SIEMENS Modernnebon Propa April 16
- Page 153 and 154:
COMPATIBILITY WITH EXISTING PLANT S
- Page 155 and 156:
SIEMENS Scope of Supply GENERATOR S
- Page 157 and 158:
SIEMENS Mcdemnahon Pnyect Page 3 Ap
- Page 159 and 160:
Supply of Equipment Contracts for n
- Page 161 and 162:
e e Interface with the customer, co
- Page 163 and 164:
CRAFT LABOR EXTRA WORK RATES SIEMEN
- Page 165 and 166:
SIEMENS Modernnabon Projecl Pdge 2
- Page 167 and 168:
SIEMENS Request No SKI22037 Use thi
- Page 169 and 170:
Use rhJ documenr solely for rhe pur
- Page 171 and 172:
SIEMENS ,. ._ - _. . - . . , April
- Page 173 and 174:
a Siemens Contract #I 45569 Work Au
- Page 175 and 176:
iemens Contra roiect Schedule C 0 :
- Page 177 and 178:
ontrac t Sum mar Savings ($000's) A
- Page 180 and 181:
Warranty PEF-NCR-00762
- Page 182 and 183:
Limits of Liability
- Page 184 and 185:
Siemens Contract Summary: 201 I Del
- Page 186 and 187:
0 Siemens Contract Summary: Proiect
- Page 188:
Alstom Initial ProuosalS-ummaw: ..
- Page 191 and 192:
02/28/2607 12:24 412-374-4011 I~ I.
- Page 193 and 194:
Siemens Scope of Supply Comments Ge
- Page 195 and 196:
2P Pg. 1 of 3 iemens Proposal #SD22
- Page 197 and 198:
a Pg. 2 of 3 Turbine Testing: Propo
- Page 199 and 200:
iemens Proposal #SD22007, CR3 Turbi
- Page 201 and 202:
f I Crystal River 3 Generator Cross
- Page 203 and 204:
Siemens Generator Workshop Feb 57,2
- Page 205 and 206:
0 H2 gland seal rings Bearing refur
- Page 207 and 208:
0 Advanced Hydrogen Cooled Stator D
- Page 209 and 210:
February 16,2007 Siemens Power Gene
- Page 211:
OPC ST 1 POD #1 080009 BATES NOS. P
- Page 215 and 216:
Quality Management Manual (QMM 602)
- Page 217 and 218:
Quality Management Manual (QMM 602)
- Page 219 and 220:
Quality Management Manual (QMM 602)
- Page 221 and 222:
Quality Management Manual (QMM 602)
- Page 223 and 224:
Quality Management Manual (QMM 602)
- Page 225:
Quality Management Manual (QMM 602)
- Page 228 and 229:
Progress Energy Florida, Inc. Cryst
- Page 230 and 231:
GENERAL INFORMATION In the event th
- Page 232 and 233:
SCOPE AND OTHER REQUIREMENTS I. Bac
- Page 234 and 235:
Appendix B program. The technical d
- Page 236 and 237:
Telephone: Email: (352) 795-0504 x6
- Page 238 and 239:
Summary Report. The selected Vendor
- Page 240 and 241:
limitations. Identify the fire prot
- Page 242 and 243:
for receiving bids. RFP documents s
- Page 244 and 245:
1. 2. 3. 4. 5. 6. Attachment 6. Alt
- Page 246 and 247:
PEF Safety Plan 18
- Page 248 and 249:
Applicable Sections of the Site Cer
- Page 250 and 251:
Helper Cooling Tower Performance Cu
- Page 252 and 253:
Local Annual Windrose 24
- Page 254 and 255:
April 10, 2008 Attn: Subject : Prog
- Page 256 and 257:
ACKNOWLEDGEMENT To: Deborah Hanna P
- Page 258 and 259:
Contractor's License Number (if app
- Page 260 and 261:
schedule for the Project’s implem
- Page 262 and 263:
. 3 90 O F Design Outlet Temperatur
- Page 264 and 265:
0 Projected EAC 0 Accomplishments 0
- Page 266 and 267:
October 13,2006 AR WA-06-2792 Mr. D
- Page 268 and 269:
AREVA NP InC. Proposal #4 161084 PR
- Page 270 and 271:
AREVA NP Inc. Proposal #4167084 - E
- Page 272 and 273:
AREVA NP Inc. Proposal #4161084 PRO
- Page 274 and 275:
AREVA NP Inc. Proposal #416 1084 PR
- Page 276 and 277:
AREVA NP Inc. Proposal #4161084 PRO
- Page 278 and 279:
AREVA NP Iflc. Proposal #4161084 PR
- Page 280 and 281:
CR-3 Power Uprate Project a Progres
- Page 282 and 283:
AREVA NP Inc. Proposal #4767084 PRO
- Page 284 and 285:
AREVA NP lnc. Proposal #4161084 PRO
- Page 286 and 287:
AREVA NP Inc. Proposal #4 161084 PR
- Page 288 and 289:
AREVA Inc. Proposal #4161084 PROPRI
- Page 290 and 291:
AREVA Inc. Proposal#4161084 PROPRIE
- Page 292 and 293:
CR-3 Power Uprate Project 20 Progre
- Page 294 and 295: AREVA Inc. Proposal #4 161084 PROPR
- Page 296 and 297: AREVA Inc. Proposal #4161084 PROPRI
- Page 298 and 299: AREVA Inc. Proposal #4 I6 7084 PROP
- Page 300 and 301: CR-3 Power Uprate Project 28 Ppgres
- Page 302 and 303: AREVA Inc. Proposal #47 61084 PROPR
- Page 304 and 305: AREVA Inc. Proposal #4161084 PROPRI
- Page 306 and 307: AREVA Inc. Proposal #4167084 PROPRI
- Page 308: A REVd inc. Proposal #47 67084 PROP
- Page 311 and 312: AREVA NP Inc P ROPRl ETARY - PENG07
- Page 313 and 314: ktum this Propsat, If requested. Pa
- Page 315 and 316: AREVA NP inc PROPRl ETARY PENG07-13
- Page 317 and 318: OPC 1 st POD #1 080009 BATES NOS. P
- Page 319 and 320: SIEMENS Modernnabon Pwnf Apnl 16 xx
- Page 321 and 322: I .- . -.. .,. Awl 16. 2007 Pqress
- Page 325 and 326: w a
- Page 327 and 328: SIEMENS Mcdwnaafion Roj& April 16,
- Page 329 and 330: SIEMENS PAOE 2 Semens Confidential
- Page 331 and 332: Mcdernuabon Projecl PPQE4 Generala
- Page 333 and 334: Modernnabon hied Apnll6, XO7 PAGE6
- Page 335 and 336: SEMENS Mcdernaabon proled Aprrl 16.
- Page 337 and 338: SIEMENS McdwnrzeOon Prolecl PAOE 10
- Page 339 and 340: MODERNIZED EXPERIENCE LIST SIEMENS
- Page 341 and 342: MODERNIZED EXPERIENCE LIST SIEMENS
- Page 343: SIEMENS
- Page 350 and 351: February 16,2007 Attention: PROGRES
- Page 352 and 353: ACKNOWLEDGEMENT Mr. Tony Owen Progr
- Page 354 and 355: 111 accordaiice with the Federal Ac
- Page 356 and 357: a. A cover letter with an inventory
- Page 358 and 359: have been invited to bid. Request b
- Page 360 and 361: PROPOSAL INCLUSIONS: 1. 2. 3. 4. 5.
- Page 362 and 363: I number of cases involving Days.:&
- Page 364 and 365: Hello Bob and Greg; I have schedule
- Page 366 and 367: Spec Page # Section Reference I P7
- Page 368 and 369: spec Page # - 3 - Section Reference
- Page 370 and 371: ~~ Spec Page # Section Reference I
- Page 372 and 373: Spec Page # Section Reference I Cry
- Page 374: Page n - 13 Section Reference - I P
- Page 377 and 378: Spec Page # - 15 Doc #250846 4110/2
- Page 379 and 380: #I I Section Reference / 6 Table of
- Page 381 and 382: I Crystal River Unit 3 Nuclear Powe
- Page 383 and 384: 7 -7- Crystal River Unit 3 Nuclear
- Page 385 and 386: Spec Page # Section Reference Cryst
- Page 387 and 388: Spec Page ti Section Referenc i/ I
- Page 389 and 390: ~ I Crystal River Unit 3 Nuclear Po
- Page 391 and 392: Spec Page # - 34 Section Reference
- Page 393 and 394: I m N I 0 Z c a 6 2 m n
- Page 396 and 397:
Spec Page # Section Reference Cryst
- Page 398 and 399:
c PROPRIETARY AND CONFIDENTIAL Alst
- Page 400 and 401:
PROPRIETARY AND CONFIDENTIAL Alstom
- Page 402 and 403:
Commercial Volume( Unpriced) PEP-NC
- Page 404 and 405:
OPC 1 st POD #1 oaooo9 BATES NOS. P
- Page 406 and 407:
Alstom Proposal # SD22007, CR3 EPU
- Page 408 and 409:
Alstom Proposal # SD22007, CR3 EPU
- Page 410 and 411:
Alstom Proposal # SD22007, CR3 EPU
- Page 412 and 413:
August 6”, 2007 JCO7-017 Project
- Page 414 and 415:
ENERCON SERVICES, INC. ENGINEERING
- Page 416:
Table of Contents I. 0 EXECUTIVE SU
- Page 419 and 420:
OPC 1 st POD #1 080009 BATES NOS. P
- Page 421 and 422:
CR3 Extended Power Uprate, Secondar
- Page 423 and 424:
CR3 Extended Power Uprate, Secondar
- Page 425 and 426:
AREVA September 4,2007 PENG07-1370.
- Page 427:
September 4, 2007 Page 3 Addendum t
- Page 432:
September 4,2007 Page 8 Addendum to
- Page 442:
PEF-NCR-0 1626
- Page 446 and 447:
CR-3 EPU BOP PHASE I IMPLEMENTION R
- Page 452 and 453:
Contract Bidders Technical Evaluati
- Page 454 and 455:
o Replace heaters CDHE3A and 3B o E
- Page 456:
D D AREVA o Completed CR3 MUR o Per
- Page 459 and 460:
Initial Bid Bid Clarification - I*
- Page 461 and 462:
Final Fixed Price Potential Conting
- Page 463 and 464:
Payment Milestones are designed to
- Page 465 and 466:
Project Technical Lead Legal Audit
- Page 467 and 468:
CK3 Extended Power Uprate, Secondar
- Page 469 and 470:
CR3 Extended Power Uurate. Secondar
- Page 471:
0 0 CR3 Extended Power Uprate, Seco
- Page 474 and 475:
CONFIDENTIh!. PEF-NCR-01658
- Page 477:
PEF-NCR-01661
- Page 481 and 482:
OPC 1 st POD #1 080009 BATES NOS. P
- Page 483 and 484:
[Prooosed Invoice Milestone - Date
- Page 485 and 486:
Your acknowledgement of receipt of
- Page 487 and 488:
Attachment A to Request No. KS12007
- Page 489 and 490:
' PROGRESS ENERGY FLORIDA, INC CRYS
- Page 491 and 492:
6 Progress Energy does not obligate
- Page 493 and 494:
GENERAL INFORMATION PROGRESS ENERGY
- Page 495 and 496:
PROGRESS ENERGY FLORIDA, MC. CRYSTA
- Page 497 and 498:
make additional copies of Bidder's
- Page 499 and 500:
designated individual listed in the
- Page 501 and 502:
.:_ e 1. 2. Classifications of each
- Page 503 and 504:
~~ ~~~ ~ L Using your company's OSH
- Page 505 and 506:
Section Referena Crystal River Unit
- Page 507 and 508:
Progress Energy Crystal River Unit
- Page 509 and 510:
Progress Energy Crystal River Unit
- Page 511 and 512:
Progress Energy Crystal River Unit
- Page 513 and 514:
Progress Energy Crystal River Unit
- Page 515 and 516:
Progress Energy Crystal River Unit
- Page 517 and 518:
Progress Energy Crystal River Unit
- Page 519 and 520:
Progress Energy Crystal River Unit
- Page 521 and 522:
I_ Progress Energy Crystal River Un
- Page 523 and 524:
... Progress Energy Crystal River U
- Page 525 and 526:
Progress Energy Crystal River Unit
- Page 527 and 528:
Progress Energy Crystal River Unit
- Page 529 and 530:
Progress Energy Crystal River Unit
- Page 531 and 532:
Progress Energy Crystal River Unit
- Page 533 and 534:
Progress Energy Crystal River Unit
- Page 535 and 536:
Progress Energy Crystal River Unit
- Page 537 and 538:
Progress Energy Crystal River Unit
- Page 539 and 540:
.. Progress Energy Crystal River Un
- Page 541 and 542:
Progress Energy Crystal River Unit
- Page 543 and 544:
Progress Energy Crystal River Unit
- Page 545 and 546:
Progress Energy Crystal River Unit
- Page 547 and 548:
Progress Energy Crystal River Unit
- Page 549 and 550:
Progress Energy Crystal River Unit
- Page 551:
~ . ...... , - . ~ - . . .. ... . .
- Page 554 and 555:
.. Your acknowledgement of receipt
- Page 556 and 557:
Attachment A to Request No. KS12007
- Page 558 and 559:
CR3 Extended Power Uprate, Secondar
- Page 560 and 561:
CR3 Extended Power Uprate, Secondar
- Page 562 and 563:
CR3 Extended Power Uprate, Secondar
- Page 564 and 565:
Tech Com International 440 Goddard
- Page 566 and 567:
Tech Com International 440 Goddard
- Page 568 and 569:
Tech Com International 440 Goddard
- Page 570 and 571:
Tech Com International 440 Goddard
- Page 572 and 573:
Tech Com International 440 Goddard
- Page 574 and 575:
~~ Tech Com International 440 Godda
- Page 576 and 577:
. . Tech Com International 440 Godd
- Page 578 and 579:
Tech Coin International 440 Goddard
- Page 580 and 581:
PEF-NCR-02040
- Page 582 and 583:
of Conformance -Technical Comments
- Page 584 and 585:
Crystal River Unit 3 Nuclear Power
- Page 586:
16 Q a
- Page 589 and 590:
CR3 Extended Power Uprate, Secondar
- Page 591 and 592:
CR3 Extended Power Um-ate, Secondar
- Page 593 and 594:
CR3 Extended Power Uprate, Secondar
- Page 595 and 596:
, Chris A. Sward Project Manager Ph
- Page 597:
Mr. Tony Owen Progress Energy Augus
- Page 611:
I'I J
- Page 614:
CONFIDENVI,' PROPOSAL STACKING OF C
- Page 618 and 619:
Yuba 2121 N. 161" East Ave Heat Tul
- Page 620 and 621:
TABLE OF CONTENTS FOREWORD ... Page
- Page 622 and 623:
J OPC 1 st POD #1 080009 BATES NOS.
- Page 624 and 625:
iermal Equipment Incorporated (TEI)
- Page 626 and 627:
TEI Contract Summary Scope of Work:
- Page 628:
TEI Contract Summarv Performance Gu
- Page 631 and 632:
TEI Contract Summary Delivery Liqui
- Page 634 and 635:
TEI Contract Summary Lim its of Lia
- Page 636 and 637:
7Eli March 26,2007 10375 Slusher Dr
- Page 638 and 639:
TABLE OF CONTENTS Page 1 .O INTRODU
- Page 640 and 641:
1 .O INTRODUCTION 1.1 General TEI -
- Page 642 and 643:
1.3 1.4 Reliability (5) FAC enduran
- Page 644 and 645:
2.2 Services a. Scaled down model t
- Page 646:
B. Outage Activities - Main Activit
- Page 650 and 651:
4.3 Thermohydraulic And Mechanical
- Page 652 and 653:
4.3.2 Other Reasons For Selecting T
- Page 654 and 655:
B. A flexible tube support system (
- Page 656 and 657:
4.3.5 Condensate Drainage As mentio
- Page 658:
4.4.2 Determination of Performance
- Page 664:
- N N N 4 p: u 2 c4 w a
- Page 669 and 670:
JOB NO. PROPOSAL "ACTION" OF FLEXIB
- Page 671:
JOB NO. PROPOSAL "RADIUSED HOLE" 04
- Page 675 and 676:
PROPOSAL STACKING OF CHEVRON VANES
- Page 677:
a CONFIDENTIP,!. PEF-NCR-02240