for receiving bids. RFP documents shall not be reproduced or used for any purpose other than<br />

for the preparation of a proposal in accordance with this request. The information contained in<br />

these documents is proprietary and confidential and shall be maintained in strict confidence.<br />

RFP Interpretation:<br />

An interpretation request shall be made to Progress Energy if a Vendor is in doubt as to the true<br />

meaning of any part of the drawings, specifications, or contractual documents. Modification of<br />

the documents will be made only by written addendum issued to each Vendor as described<br />

below.<br />

RFP Exceptions:<br />

If a Vendor’s proposal contains any deviations or exceptions, those deviations or exceptions must be<br />

specifically identified on a single separate attachment to the proposal in order to be considered in the<br />

evaluation, If not so identified, the deviations or exceptions will not be considered part of the<br />

proposal. Conditional proposals based on Vendor-generated clarifications may not be accepted. If a<br />

Vendor takes any exceptions in addition to those submitted in accordance with this section, that<br />

Vendor’s proposal may be rejected by Progress Energy.<br />

RFP Approved Equal Evaluation:<br />

Submittals by Vendor for evaluation of products as “approved equal” shall be made to the<br />

appropriate designated individual listed in the Request for Proposal at least ten (1 0) days prior to<br />

the proposal due date. Results of evaluations will be provided no later than seven (7) days prior<br />

to the proposal due date. Submittals made later than ten (1 0) days prior to the proposal due date<br />

will not be considered.<br />

RFP Addenda:<br />

Progress Energy reserves the right to amend or clarify requirements herein by Addenda. An<br />

addendum may be issued at any time prior to the date for receipt of proposals and may be mailed<br />

or otherwise delivered to all Vendors who have been invited to bid. Request by a Vendor for<br />

extension of the proposal due date shall be received by Progress Energy at least one week prior to<br />

the then scheduled date. If revisions or clarifications are of magnitude to warrant, in the opinion<br />

of Progress Energy, the extension of the date set for receipt of proposals, an addendum will be<br />

issued announcing the new date. Failure of a Vendor to acknowledge receipt of any addendum in<br />

the space provided on the proposal form may result in rejection of that proposal.<br />

Safety:<br />

Progress Energy is committed to using safety conscious contractors. To this end, Progress<br />

Energy collects safety-related data voluntarily provided by all persons performing or desiring to<br />

perform Progress Energy work. This data is compiled and made available to Progress Energy<br />

employees via Progress Energy’s intranet. This intranet system is accessible by non-Progress<br />

Energy employees, and thus, so will be any safety-related information you provide. In providing<br />

the safety-related information requested herein, to Progress Energy or to any other person doing<br />

business, directly or indirectly, with Progress Energy, the undersigned contractor explicitly<br />

authorizes Progress Energy to disclose said information to non-Progress Energy persons and<br />

hereby releases Progress Energy and its agents and employees from any cause of action or claim