02.06.2014 Views

siemens - Public Service Commission

siemens - Public Service Commission

siemens - Public Service Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Siemens Generator Workshop<br />

Feb 57,2007<br />

Charlotte NC<br />

Mark Pringle - Director Charlotte Fort Payne Operations<br />

Opening Remarks and Agenda<br />

Power Uprates and retrofit and upgrade capabilities<br />

Tour of Siemens Turbine Generator <strong>Service</strong> center<br />

Andrew Medla - Director Generator Engineering<br />

Generator Developments and Implications for Operating Fleet<br />

Overview of World Wide Operations and facilities<br />

Computational Tools<br />

3D Finite element analysis of turbine blading, Improved efficiencies and reliability in<br />

severe thermal cycles, load following<br />

Computational Fluid Dynamics, allows for increased cooling less heating, allows for<br />

increased design capabilities, then compared to actual field data results.<br />

New design 2200 MVA 50 Hz, new design technologies and materials directly applicablc<br />

to uprates and upgrades.<br />

0<br />

Objectives - Speed, Dependable Generation, Life Extension, Capacity Increase<br />

Strategy - Fast Rewinds, Airkiquid Cooled upgrades, stacked cote replacements<br />

Core Replacement 18 days<br />

Stator Rewind < 20 days<br />

Rotor Rewind 29 days<br />

Exciter Rewind 28 days<br />

J Strap Change out 15 days<br />

Balancing 20 moves 24 hours<br />

Coil Lead time 9 months minimum prefer one year<br />

Shipping of components requires dedicated rail and at least 5 days on cach cnd.<br />

Performance Plus Seal State of Art Carbon seal technology greatly reduces oil<br />

consumption by a factor 50: 1. Can be used with increased H2 pressure up to 75 psig.<br />

How do we increase MVAK loading capability on existing machines? Additional<br />

windings. Who should pay for upfront design (vendor or industry)?<br />

Mark Pringle - Director Cbarlotte Fort Payne Operations<br />

Generator Factory <strong>Service</strong>s<br />

*<br />

Quality Culture, Manufacturing technologies, Upgradeflprates, Repairs

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!