Spec<br />

Page<br />

#<br />

Nuclear Power Station<br />

Replacement Turbine Generator<br />

SedionReference / 6 / / < / (II / Table of Conformance - Technical<br />

Crystal River Unit 3<br />

1 High pressure turbine retrofit.<br />

I I Low pressure turbine retrofit.<br />

I I Generator stator and rotor rewind.<br />

for nuclear power plant workers.<br />

1.3.2<br />

I I<br />

i<br />

I .4<br />

QA CONDITION<br />

NON-SAFETY RELATED.<br />

i<br />

(1.5.3 I<br />

i<br />

- i<br />

- Generator stator hydrogen (H2) inner cooled winding, and<br />

water (H20) cooled winding options should be provided<br />

Generator stator midsection replacement (optional scope).<br />

Exciter I voltage regulator modification I replacement.<br />

MSR vessel replacement.<br />

Turnkey Installation and commissioning service for proposed solution.<br />

- Installation shall be performed in accordance with NRC 72 hour work week rule<br />

Combine the total Work Scope (proposed solution) in one bid.<br />

The Replacement Turbine Steam Paths to be provided are classified as<br />

Evaluation of any design basis requirements of rotating machineiy will be required<br />

I I HP Turbine Model: Please refer to page 6 of the Specifications.<br />

11.5.4 I I I HP Turbine Steam Chests: Please refer to page 6 of the Specifications.<br />

11.5.5 I I I LP Turbine Model: Please refer to page 6 of the Specifications.<br />

I<br />

Comments<br />

46<br />

411012008 P = Paragraph No