Progress Energy Crystal River Unit 3<br />

Request for Proposal for Engineering <strong>Service</strong>s to Upgrade Secondary System<br />

6/25/2007<br />

Two EC packages are required, one to procure the two new Feedwaler Booster pumps<br />

and motors, and a separate EC package to install these new pumps and motors in the<br />

plant. Procedure EGR-NGGC-0005, Engineering Change describes the steps<br />

necessary to prepare an EC package.<br />

38<br />

PEF-NCR-02004