02.06.2014 Views

siemens - Public Service Commission

siemens - Public Service Commission

siemens - Public Service Commission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Spec<br />

Page<br />

#<br />

-<br />

34<br />

Section Reference<br />

I<br />

Crystal River Unit 3<br />

Nuclear Power Station<br />

Replacement Turbine Generator<br />

Table of Conformance - Technical<br />

Comments<br />

34 -<br />

34 -<br />

34 -<br />

- 34<br />

35<br />

I I I I I I I I not be limited to, installation drawings, installation instructions, welding information, I I<br />

I<br />

bill of materials, etc.<br />

18.2 I I I Provide instructions for balancing the equipment following the installation.<br />

Doc #E0846<br />

4/10/2008 P = Paragraph No

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!