0 A-2<br />

It<br />

1<br />

1.1.<br />

CR3 Allov 600 PWSCC Mltiaation Proiecf<br />

Pressurizer and Sume Line Modiflcations 1<br />

Description C. X. A. and E Proposal Section<br />

Project Description<br />

IntroductionlProject Background:<br />

Crystal River Unit 3 will be undertaking a series of component replacement and reinforcement activities<br />

during the 15th refueling outage (RFO15) currently scheduled for late 2007. These activities are<br />

intended to reduce the risk of Alloy 600/82/182 Primary Water Stress Corrosion Cracking (PWSCC)<br />

associated with the Pressurizer and Surge Line. When complete, all susceptible componentdregions<br />

in the Pressurizer and Surge Line will have been replaced, reinforced or will have been reconfigured<br />

such that no Alloy 600/82/182 will be performing a Reactor Coolant Pressure Boundary function.<br />

The Bidder is requested to submit a comprehensive proposal based on the requirements contained<br />

herein and on the previous experience of the Bidder with similar proposals and/or projects. The Bidder<br />

is requested to bid the scope of work described to optimize the overall Alloy 600 Mitigatlon program for<br />

Prooress Enerav.<br />

C 4.0<br />

1 I Evaluation (NDE). and demobilization activities associateiwith the modification of the following I I I<br />

12'1'<br />

1.2.1.1.<br />

A A<br />

1 .L.C.<br />

1*23'<br />

1.2.3.1.<br />

components:<br />

Pressurizer Relief Valve Butt Welds (total of 3)<br />

Pressurizer Spray Line Extension Pin and Safe End<br />

Pressurizer Vent Nozzle<br />

Pressurizer Sample Tap Nozzle<br />

Pressurizer Lower Level Tap Nozzles (total of 3)<br />

Pressurizer Thermowell<br />

Pressurizer Surge Line Nozzle Butt Weld<br />

Hot Leg Surge Line Nozzle Butt Weld<br />

The Relief Valve Butt Welds are to be modified by removing the existing Alloy 82/182 welds and<br />

flanges and replaclng with equivalent flanges attached with Alloy 52/152 welds.<br />

The bidder may propose a weld inlay technique for these locations.<br />

The Sorav line Extension Pin and Safe End and attachment welds are to be replaced with Allov 690<br />

components attached with Alloy 52/152 welds.<br />

The Vent, Sample Tap, and Lower Level Tap Nozzles are to be modified using a half-node<br />

replacement methodology employing Alloy 690 components attached with Alloy 521 52 welds.<br />

The preferred half-nozzle replacement methodology is to use a mid-wall weld as opposed to an<br />

external weld build-up and attachment weld. The proposal may contain either methodology at the<br />

Bidder's discretion.<br />

C 4.0<br />

C 4.0<br />

m<br />

, A<br />

L 4.u<br />

C 4.0<br />

A 4.0<br />

'C (Conforml -The Bidder meets the requirement in the manner indicated.<br />

X /ExMDL~o~~ - An approach which does not meet the requirements or a requirement the Bidder declines to meet.<br />

A @h"q) - An approach which is substantially different kom the suggested approach but whldr meets the slated requirements.<br />

E (Enhancement) -An element not required by the Requirements Documents but offered for consideration.<br />

PEF-NCR-00778