0<br />

Time for cleaning, painting<br />

Belly cover installation<br />

Fresh crew for reassembly<br />

Ops must own ventilation test<br />

Obtain MSDS and chemical list early<br />

Replace bushings and CTs<br />

Tom Schubert - Manager Global Generator <strong>Service</strong> Engineering<br />

Industry Trends and fleet demographics<br />

Global Overall Electrical yearly output 9% Increase over 5 years<br />

Average US base load is currently 32 years in service<br />

This base 20-40 years in service equates to approximately 80% of total base load<br />

30-40 years is approximately 45% of US base load<br />

Typical Life Cycle for large frame generators is 30-40 years<br />

Alex Christodoulo - Manager Generator <strong>Service</strong>s Engineering<br />

Modernizing and Servicing generator stators<br />

Overview of Water and Hydrogen cooled stator<br />

Recommended maintenance to extend life cycle an additional 30 years<br />

0<br />

Stator Windings - End connection strand cracking, End winding loosening, parallel ring<br />

looseness, and phase lead cracks. These are caused by thermal stresses and age<br />

degradation, mechanical forces caused by electromagnetic forces in natural fiequency<br />

ranges. Transient damage caused by severe fault etectro-mechanical stresses. These<br />

mechanisms can today be controlled by the advancement of material composition and<br />

design modeling. Generator is designed to withstand a 3 phase short.<br />

Stator Core - Only 5 Major core losses over last 50 years, foreign object 5, Over fluxing<br />

5, Looseness 3, Installation 1, Unknown 1.<br />

Recommended Maintenance<br />

El-cid < 1 OOmilliamp - look for hot spots with thermo vision inspection<br />

Shorted laminations - grind out make field repairs or terminate<br />

Core Looseness and Length - through bolts may bottom out need to add more iron plates<br />

Core End Iron heating - new designs are more adequately cooled<br />

End Shield laminations - end shield replacement<br />

3 Options<br />

Onsite Stator rewind and corc refurbishment<br />

Onsite Stator rewind and core replacement with donut stacking replacement<br />

Onsite replacement with seed or new components<br />