On the spot engineering resolution to any “as is” deviations or<br />

nonconformances, thus protecting schedule.<br />

A single responsibility and expertise in the installation execution and a<br />

consistent continuity.<br />

Contingency plans for unexpected bottleneck, delays or obstructions.<br />

Adjusting, if needed, day to day current work plan to meet any obstacles.<br />

Assessing potential problems will assure preparedness and expeditious resolution<br />

of same.<br />

TEI, as an MSR designer / fabricator will assure careful installation of the<br />

vessels so as to avoid damage to existing MSR structure.<br />

Key installation people are veterans of similar jobs with hands-on and recent<br />

experience. They will do-it-right at CR-3 the first time, since for them it will not<br />

be the first time.<br />

TEI’s knowledge of the job provides for responsible, realistic and achievable<br />

installation schedule.<br />

TEI when installing its own MSR replacement equipment carries an undivided<br />

responsibility for the integrity of the vessels and structure.<br />

TEI is a custom installer of this type of equipment. We are not a general<br />

construction company. This job will be reviewed week-by-week by TEI’s top<br />

management; CR-3 will be given direct access to TEI’s corporate management.<br />

2.0<br />

SCOPE OF SUPPLY AND SERVICES<br />

2.1 Equipment<br />

a. Four (4) complete MSR vessels, built to ASME Code (as shown below),<br />

delivered to site F.O.B., Nz purged, uninsulated, painted, with integral supports<br />

to match existing locations.<br />

b. Eight (8) excess steam flow regulating valves, S.S. trim.<br />

c. Monitoring, integral instrumentation and matching readout devices.<br />

d. All required pipe spools, designed to B3 1.1, to match existing cut lines.<br />

e. Spare gaskets, tube plugs, chevron vanes and sample tube sections.<br />

f. Complete documents package including: Q.A. documentation file, design<br />

calculations, operatiodmaintenance manual and equipment drawings.