Alstom Proposal # SD22007, CR3 EPU Turbine Generator Retrofit Meeting Notes, 05/15/07: Pg. 1 of 7<br />

Outape Schedule: 2009 outage schedule is 75 days for Hp and LP turbine replacement, generator mid-section replacement and MSR replacement.<br />

Schedule driver is shop rewind of generator rotor (60 days, 45 days in shop).<br />

ODtional Scope: Generator Stator f eld rewind-with H20 cooled winding. Stator core iron is not replaced.<br />

Cost: total estimated cost reduced t&%KTEDT Generator Rating: stator rating reduced to 1162.5 MVA.<br />

Schedule: 2009 outage schedule will not decrease due to off site rotor rewind.<br />

Meeting Summary Hivhlights:<br />

e AIstom proposal amendment letter requested by June 1,2007.<br />

0 Generator rotor replacement is required to improve the 75 day schedule and to increase MVA rating to 1200MVA. Generator rotor<br />

replacement will be 2011. Requested Alstom to price new rotor vs. rewind rotor.<br />

e Requested Alstom to consider 2007 open and close of HP tclrbine and generator to be R&D cost by them.<br />

e Requested Alstom to quote 57”LSB LP turbine option.<br />

e Support systems for water cooled stator skid and static excitation system are additional cost. Alstom requested to provide support system<br />

requirements.<br />

e Control Room impacts for water cooled stator skid and static excitation system (voltage regulator) are additional cost. Alstom requested to<br />

provide control room impact details.<br />

e Include laser alignment of entire train, including generator alignment and generator frame foot loading @g. 110).<br />

e Include Re-striping all bearing pedestal oil seals.<br />

0 Include HP and LP turbine bearing be rebabbitted in base scope due to new rotor journals.<br />

e Include machining of all HP Turbine cylinder interface locations as f ~d$ t:,install t *’ new .,-. parts.<br />

t ,,; i‘p-i<br />

e Need to provide Installation “Division of Responsibilities”.