I<br />

Crystal River Unit 3<br />

Nuclear Power Station<br />

Replacement Turbine Generator<br />

Table of Conformance - Technical<br />

Comments<br />

I I I I I I Four complete replacement moisture separator reheater vessels with two stages of<br />

PI<br />

P2<br />

P3<br />

P4<br />

P5<br />

P6<br />

P7<br />

1<br />

I<br />

reheat and four pass tube bundles shall be included in the Seller‘s scope of supply.<br />

MSR moisture separation and tube bundles should be designed to optimize the<br />

turbine steam cycle to achieve the best performance within the existing shell<br />

envelope.<br />

Existing nozzle configuration and piping should be reused to the extent possible.<br />

The MSR shall be designed in accordance with Electric Power Research Institute<br />

(EPRI) NP-3692 “Procurement and Operation Considerations for Moisture<br />

Separator Reheaters.“<br />

439 SS tube material shall be specified.<br />

MSR instrumentation package shall be included.<br />

INSTRUMENTATION AND CONTROLS<br />

The turbine AEH control system is expected to be reused. Refer to Section 1.7.5 of<br />

the Bid Specification for more information.<br />

The turbine supervisory instrument system is a Bently Nevada 3300 system and is<br />

expected to be reused. Refer to the Bid Specification for more information.<br />

Pickup mounting details will be provided by the Owner to support retrofit design.<br />

Refer to the Bid Specification, page 12 for more information.<br />

Generator rotor flux probes will be reused or replaced. Refer to page 12 of the Bid<br />

Specification for more information.<br />

Recommend new generator monitoring systems (rotor flux monitor, stator end turn<br />

vibration monitor, stator partial discharge monitor, etc.) as appropriate.<br />

Fumish all electrical components and associated auxiliary equipment required to<br />

support:<br />

0 the turbine replacement<br />

0 the MSR replacement, and<br />

0 generator modifications.<br />

Fumish a MSR instrumentation package, and<br />

Fumish a generator instrumentation package.<br />

Evaluate existing electrical and control systems and interfaces to verify existing<br />

capabilities and compatibility, specifically:<br />

0 Turbine speed control system (AEH Electro-Hydraulic Control System).<br />

0 Auxiliary instrumentation and controls.<br />

Design equipment to ensure that all of the interfacing systems, structures, and<br />

components shall be reused, if possible, and shall operate with minimal<br />

modification of the systems.<br />

Doc a50846<br />

4/10/2008 P = Paragraph No 8