02.06.2014 Views

siemens - Public Service Commission

siemens - Public Service Commission

siemens - Public Service Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I<br />

Crystal River Unit 3<br />

Nuclear Power Station<br />

Replacement Turbine Generator<br />

Table of Conformance - Technical<br />

Comments<br />

I<br />

- Turbine Stage Moisture Removal Effectiveness<br />

- LP Turbine Exhaust Loss Curve<br />

- Generator Loss<br />

Phase 2 Installation: HPT. Balance of Plant Modifications Guarantee<br />

Guarantee the turbine-generator gross electrical output (MW,) uplift after<br />

installation of the HPT steam paths at 3030 MWt backpressure, and makeup in<br />

a r c " with the rantract ouarantee heat balance<br />

This performance improvement results directly and exclusively from the scope of<br />

supply defined in this specification.<br />

Provide a revised thermal kit for the revised turbine designs that includes the<br />

following but not limited to:<br />

- Heat Balance Diagrams with the new HPT and balance of plant components at<br />

WO, 100% MWth (guarantee point), 75%, 50% and 25%. The baseline and<br />

guarantee HBDs will provide the basis for the thermal performance warranty.<br />

- Net Heat Rate<br />

- Turbine Expansion Line for each Heat Balance<br />

- HP Turbine expansion line end points<br />

- First Stage Pressure vs. Flow<br />

- Extraction Stage Pressure vs. Flow<br />

- Gland Leakages and Mechanical Losses<br />

- Heat Rate and Load Correction Curves for<br />

o Exhaust Pressure,<br />

o Throttle Pressure,<br />

o Throttle Temperature,<br />

o ReheaterllD<br />

- Turbine Stage Moisture Removal Effectiveness<br />

Turbine Performance<br />

The Sellets heat balance shall be based on the operating parameters specified<br />

on the Buyers heat balance for nominal full load conditions.<br />

Specific requirements for the design include:<br />

- HP turbine throttle pressure and temperature,<br />

- HP turbine throttle enthalpy,<br />

- HP turbine throttle flow, and<br />

- Final feedwater temperature<br />

Values for feedwaler heater performance at uprated conditions as well as<br />

extraction line pressure losses can be obtained from the Buyers heat balance.<br />

Values for MSR performance shall be provided based on the proposed new<br />

desian<br />

PEF-NCR-01301<br />

Doc a50846<br />

4/10/2008 P = Paragraph No<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!