Progress Energy Crystal River Unit 3<br />

Request for Proposal for Engineering <strong>Service</strong>s to Upgrade Secondary System<br />

6/25/2007<br />

4.4 QA Condition<br />

The equipment identified in this proposal request is classified as non-nuclear<br />

safely related. The analysis work described in this proposal request is<br />

classified as non-nuclear safety related except for the revision of the existing<br />

mechanical calculations and the evaluation of the feedwater block valves.<br />

1.5 Existing Configuration<br />

The existing configuration is described in existing drawings, specifications<br />

and calculations.<br />

7<br />

PEF-NCR-0 I973