Progress Energy Crystal River Unit 3<br />

Request for Proposal for Engineering <strong>Service</strong>s to Upgrade Secondary System<br />

6125/2007<br />

load and identify required upgrades of the electrical distribution<br />

system.<br />

o Voltage DroplShort Circuit for AC Electrical System - SKM<br />

Software<br />

o Non Safety 125 VDC - €TAP Software<br />

1.9.14 Mechanical Ultimate Heat Sink Calculations<br />

Update the following calculations to reflect EPU conditions.<br />

Calculation M97-0133, “SW Heat Loads During LBLOCA and<br />

SW Temperature Decay Times,“ Rev 11<br />

Calculation M95-0020, “DCHE Performance Evaluation,” Rev<br />

1<br />

Calculation M95-0044, “RWIDCIDH Thermal Analysis - DC<br />

Temperature Calculation,“ Rev 1<br />

Calculation M95-0035, “SW System Inventory Transient<br />

Analysis,” Rev. 2<br />

1.9.15 Turbine Building Structural Evaluation<br />

. Perform an evaluation of the turbine building structure and<br />

supports for major equipment to identify if any significant<br />

changes are required to accommodate the expected increases<br />

in loads resulting from new and larger equipment such as<br />

turbine rotors, main generator, etc.<br />

1.10 Schedule<br />

Proposals shall be submitted within 28 days following receipt of the proposal<br />

request,<br />

1.11 Required Bid Documentation<br />

1.11 .I Seller shall submit a complete proposal fully describing all of the<br />

services to be fumished. All documents shall be in English and in U.S.<br />

measurement units.<br />

1.11.2 Exceptions to the proposal request must be clearly identified.<br />

1.11.3 A project level milestone schedule identifying the start date of each<br />

task and sub task, completion date of the tasks, subtasks, and the<br />

overall completion date. Need dates for information not being<br />

developed by the seller should be included in this schedule.<br />

-<br />

1 ,I 1.4 The seller may offer additional optional scope of supply as defined by<br />

seller.<br />

1 .I 1.5 The seller must provide the organizational structure of labor for<br />

engineering services described in this proposal request including<br />

supervision, technical direction and project management. The staffing<br />

levels should be provided for each task identified in the proposal<br />

request.<br />

1 ,l 1.6 The seller should describe the project management measures to be<br />

implemented to control the cost schedule and risks associated with<br />

this scope of work.<br />

1.11.7 Any of the work in this proposal that the seller intends to subcontract<br />

must be clearly identified. The buyer must approve all subcontractors.<br />

13