Progress Energy Crystal River Unit 3<br />

Request for Proposal for Engineering <strong>Service</strong>s to Upgrade Secondary System<br />

6/25/2007<br />

1.9.6 Feedwater Heater and Feedwater Heater Drain Modifications<br />

Replacement of Feedwater Heaters CDHE3A and -38<br />

o Prepare a feedwater heater specification<br />

o Prepare an EC to purchase two new third point feedwater<br />

heaters<br />

o Prepare an EC to install 2 new third point feedwater<br />

heaters<br />

Evaluation of the existing feedwater heaters<br />

o Characterize the condition of the existing feedwater<br />

heaters that will remain in service<br />

o Establish a monitoring program following EPU<br />

implementation for these feedwater heaters<br />

Heater Drain Valves HDV-101, -102, -103, and -104,<br />

o Prepare a valve specification for the first point heater drain<br />

valves<br />

o Prepare an EC to purchase four new first point feedwater<br />

heater drain valves<br />

o Prepare an EC to install four new first point feedwater<br />

heater drain valves<br />

Heater Drain Valves HDV-247, -248, -249, and -250<br />

o Prepare an EC to replace the piping upstream of Heater<br />

Drain Valves HDV-247, -248, -249, and -250 with piping<br />

with a higher pressure and temperature rating.<br />

1.9.7 Secondary <strong>Service</strong>s Closed Cycle Cooling System Modifications<br />

Perform an evaluation to determine the maximum capacity and<br />

cooling flow of the secondary cooling heat exchangers based<br />

on existing space limitations. Perform an evaluation to<br />

determine the maximum flow by replacing the SC pump<br />

impellers and motors.<br />

Prepare a new specification for the Secondary Cooling Heat<br />

Exchangers 1A and 18<br />

Prepare an EC to purchase hvo new SC heat exchangers<br />

Prepare an EC to install two new SC heat exchangers<br />

e Revise Secondary Cooling pumps and motors, SCP-1A and -<br />

1 B specification<br />

Prepare an EC to purchase two new SC pump impellers and<br />

motors<br />

Prepare an EC to install two new SC pump impellers and<br />

motors<br />

11<br />

PEF-NCR-0 1977