Progress Energy Crystal River Unit 3<br />

Request for Proposal for Engineering <strong>Service</strong>s to Upgrade Secondary System<br />

8/25/2007<br />

1.2.7. Perform an evaluation to determine the maximum capacity and<br />

cooling flow of the secondary cooling heat exchangers and secondary<br />

cooling motor, pump, and impellers based on existing space<br />

limitations.<br />

1.2.8. Determine if the feedwater control valves and main feedwater pump<br />

control system are stable under EPU conditions.<br />

1.2.9. Perform an evaluation of the existing feedwater heaters to<br />

characterize the existing condition and establish a monitoring program<br />

following EPU implementation.<br />

1.2.10. Prepare Engineering Change packages and other associated<br />

procurement documentation for purchasing new Feedwater Heaters<br />

CDHE-3NB, Heater Drain Valves HDV-101, -102, -103, and -104,<br />

Secondary Cooling Heal Exchangers 314 and 38, Circulating Water<br />

pumps and motors lA, 18,lC and 10, Secondary Cooling pumps<br />

and motors, SCP-1A and -, Condensate pumps, motors and variable<br />

speed drives, CDP-1A and 18, and Feedwater Booster pumps and<br />

motors, FWP-2A and 28.<br />

I .2.11 Prepare EC’s (EGR-NGGC-005) to install the new Feedwater Heaters<br />

CDHE3A and -38, Heater Drain Valves HDV-101, -102. -103, and -<br />

104, Secondary Cooling Heat Exchangers 1A and 18, Circulating<br />

Water pumps and motors 1 A, 1 B, 1C and 1 D, Secondary Cooling<br />

pumps and motors, SCP-IA and -18, Condensate pumps, motors<br />

and variable speed drives, CDP-1A and lB, Feedwater Booster<br />

pumps and motors, FWP-PA and 28, , MSRs and MSR Belly Drain<br />

Heal Exchangers, Deaerator bypass line, redundant lsophase Bus<br />

Duct Cooling System, and High and Low Pressure Turbine rotors and<br />

inner casings and turbine generator and exciter.<br />

1.2.12. Prepare an EC to replace the piping upstream of Heater Drain Valves<br />

HDV-247, -248, -249, and -250 with piping with a higher pressure and<br />

temperature rating.<br />

1.2.13 Conduct an evaluation of the turbine building structure considering the<br />

expected additional loads resulting fmm installation of new and larger<br />

equipmen!.<br />

1.3 Proposal Pricing<br />

Seller shall evaluate and present bid proposal pricing in the following formats:<br />

1.3.1 Each of the major tasks described in Section 1.9 should be bid<br />

separately.<br />

1.3.2 Each of the computer model updates described in Section 1.9 should<br />

be bid separately.<br />

1.3.3 Combine the total work scope.<br />

6<br />

PEF-NCR-01972