other information provided in its process ofevaluating Bidder's proposal. PE may, in its sole discretion, reject any<br />

or all proposals received or waive minor defects, irregularities or informalities therein.<br />

a. Upon reaching the award decision, PE may elect to issue a Letter of Intent to the successful Bidder.<br />

Bidder shall include a statement within its proposal as to its commitment to start work immediately and<br />

continue performance of such work upon receipt of such letter.<br />

b. The successful Bidder may be required to fumish corporate guaranties from each of its corporate<br />

ownerships up to and including the parent corporation. Such documents will be due upon execution of the<br />

contractual document. Bidder shall include a statement within its proposal acknowledging Bidder's<br />

understanding and agreement to fumish such corporate guaranties in the form furnished with this RFP.<br />

Schedule Risk:<br />

Timely completion of the design work for secondary systems for Crystal River Unit 3 must be completed<br />

in accordance with the submittal due dates in Section 1.12 of the Bid Specification to support the fall 2009<br />

refueling outage and implementation of an extended reactor power uprate of 17% during the fall 201 1<br />

refueling outage is critical to the success of this project. Therefore, the selected bidder will be asked to<br />

place profit at risk to demonstrate understanding and ownership of the schedule.<br />

Irrevocable Standby Letter of Credit:<br />

Bidder shall affirm on the proposal form its ability and willingness to fumish, in PE'sfavor, an irrevocable standby<br />

Letter of Credit per the Contract. The Letter of Credit shall remain in full force and effect during the term of the<br />

contract and may be engaged by PE in the event of Bidder's default under any such contract.<br />

~nsurance:<br />

Furnish proof of valid insurance per contractual requirements.<br />

Alternate Bid Formats:<br />

A bid based on the requirements noted herein is required; however, PE encourages Bidder to propose an altemative<br />

response.