29.08.2014 Views

FY12 Adopted Operating Budget & Capital Improvement Budget

FY12 Adopted Operating Budget & Capital Improvement Budget

FY12 Adopted Operating Budget & Capital Improvement Budget

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

City of St. Petersburg, Florida – FY 2012 <strong>Adopted</strong> Fiscal Plan<br />

2012 thru 2016 <strong>Capital</strong> <strong>Improvement</strong> Plan – Project Descriptions by Fund<br />

Neighborhood & Citywide Infrastructure CIP Fund (3027)<br />

This fund was established in FY98 to account for infrastructure improvements funded from the Local Option Sales Surtax.<br />

Project Descriptions<br />

FY 2012<br />

<strong>Adopted</strong><br />

Special Assessments Administration 200,000<br />

This project provides for the administration of the Special Assessment Program pertaining to the paving of streets, alleys, and<br />

small boat channel dredging when petitioned by benefiting property owners.<br />

Neighborhood Partnership Grants 75,000<br />

The Neighborhood Partnership Matching Grants Program has been in place since 1993. The program allows for neighborhood<br />

and business groups to propose and implement improvements within the public rights-of-ways or city-owned properties. The<br />

grant recipient must "match" their award with volunteer hours, cash, or in-kind services. The awardees are also responsible for<br />

ongoing maintenance of their projects unless otherwise stated by City.<br />

Street & Road <strong>Improvement</strong>s 4,000,000<br />

This project provides for sealing, resurfacing and restoration of paved streets, curbs, and alleys. The goal for this program is a<br />

15-year improvement cycle (110 lane miles per year).<br />

Curb Replacement / Ramps 500,000<br />

This project involves replacing existing curbing that is deteriorated and constructing handicap ramps in conjunction with street<br />

and road improvements.<br />

Sidewalk Reconstruction / Expansion 600,000<br />

This project provides for the reconstruction and repair of sidewalks at no cost to property owners.<br />

Roser Park Street <strong>Improvement</strong>s 1,000,000<br />

This project reconstructs the street's existing brick surface roadway, including the roadway pavement, granite curbs, and<br />

concrete sidewalks; restores driveways; and upgrades drainage system, grading, sodding, signing, and pavement marking.<br />

Intersection Modification 100,000<br />

The operational effectiveness of various intersections is evaluated using prescribed traffic engineering studies and capacity<br />

simulation models. The intersection(s) determined to provide the best cost/benefit is selected for implementation of the<br />

required modifications.<br />

Neighborhood Transportation Program 100,000<br />

These funds provide for the installation of appropriate traffic control features throughout the cites neighborhoods, where<br />

identified safety concerns have been verified. Locations are determined through the development of Neighborhood Traffic<br />

Plans and Neighborhood Traffic Circulation Plans, which are developed and approved by residents with the guidance of<br />

Transportation Department staff and prioritized through a cost/benefit ratio.<br />

Bicycle Pedestrian Facilities 200,000<br />

This project provides for the development of safe interconnected citywide bicycle and pedestrian facilities, as prescribed in the<br />

Bicycle Pedestrian Master Plan, approved by City Council in 2003.<br />

One-Way to Two-Way Conversions 100,000<br />

This project provides for the conversion of current one-way roadways in the downtown to two-way, including 2nd Avenue S<br />

between 4th and 10th Streets.<br />

Blueway Trails 75,000<br />

This is an annual program to expand the City's canoe and kayak trail system.<br />

Fiscal Year 2012 O - 6 Summary Reports

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!