ORGANIZATION OF REPORT<br />

The BOD Report is organized into seven (7) major sections<br />

followed by Appendices.<br />

1 Introduction<br />

Includes the background <strong>of</strong> the project, a definition <strong>of</strong> the<br />

purpose <strong>of</strong> the BOD Report, a description <strong>of</strong> the work performed<br />

and the organization <strong>of</strong> the report and project.<br />

2 Executive Summary<br />

Includes a comprehensive list <strong>of</strong> definitions <strong>of</strong> key words<br />

pertaining to the project and the BOD Report; the A/E team’s<br />

organizational chart; a quantitative summary <strong>of</strong> component<br />

space requirements; a summary <strong>of</strong> project costing and the<br />

project schedule.<br />

3 General Planning Criteria<br />

Includes broad conceptual statements related to the Pier as a<br />

whole and will influence the planning and design processes in<br />

the upcoming phases <strong>of</strong> the project. It is not intended to set<br />

definitive design decisions, but to establish the relationships<br />

between major parts. This section also establishes the technical<br />

criteria and benchmarks for building code, permitting,<br />

occupancy/egress, fire and safety compliance, and summarizes<br />

relevant design information based on the input <strong>of</strong> the public, the<br />

marine science community and the Pier Advisory Task Force.<br />

4 Component Planning Criteria<br />

Includes a description <strong>of</strong> eight (8) individual program<br />

components comprising the project. This section defines the<br />

activities and functions <strong>of</strong> each program component in addition<br />

to its users, character, physical space estimates and technical<br />

requirements.<br />

5 Basis <strong>of</strong> Design Concept Analysis<br />

Includes BOD architectural drawings and diagrams.<br />

6 Construction Manager at Risk: Project Implementation<br />

Includes project implementation information and a preliminary<br />

schedule. The detailed cost model developed by Construction<br />

Manager at Risk is included as Appendix M.<br />

7 Operating Expense and Maintenance Estimates<br />

Includes estimated operation and maintenance costs for the<br />

project.<br />

MICHAEL MALTZAN ARCHITECTURE, INC. 1 - 7