BASIS OF DESIGN BOOK 1<br />

4 COMPONENT PLANNING CRITERIA<br />

PROGRAM COMPONENTS<br />

Components<br />

Program components for the new <strong>St</strong>. <strong>Petersburg</strong> Pier include:<br />

• Welcome Mat - 47,400 sq. ft.<br />

• Hub - 22,350 sq. ft.<br />

• Overwater Drive - 34,050 sq. ft.<br />

• Overwater Bridge - 20,100 sq. ft.<br />

• Lens Canopy - 54,500 sq. ft.<br />

• Promontory - 18,050 sq. ft.<br />

• Lens Marina - 9,150 sq. ft.<br />

• Underwater Feature - 20,000 sq. ft.<br />

General Organization<br />

Uplands<br />

The overland components <strong>of</strong> the project – the Welcome Mat<br />

and the Hub – are constructed on the existing Uplands area.<br />

This portion <strong>of</strong> the project requires no specialized marine<br />

construction and selective demolition.<br />

Overwater<br />

The Overwater components <strong>of</strong> the project – the Overwater<br />

Drive, Overwater Bridge, Promontory, Lens Canopy and Marina<br />

– comprise the Pier elements <strong>of</strong> the project. These components<br />

will require specialized marine construction and demolition <strong>of</strong><br />

the existing Pier.<br />

4 - 2<br />

THE NEW ST. PETERSBURG PIER