32 How wide are the bridges?<br />

The Overwater Drive, beginning near Spa Beach and ending<br />

at the Promontory, is 20-ft clear between the railings and will<br />

accommodate emergency vehicles, service vehicles and a<br />

public trolley. A vehicular turnaround large enough for fire trucks<br />

and the trolley is provided at the Promontory. The Overwater<br />

Bridge, which spans from the Hub and to the Promontory and<br />

accommodates pedestrians and bicycles, is 10-ft clear between<br />

the railings. Motor vehicles will not be accommodated on this<br />

portion <strong>of</strong> the new Pier.<br />

33 What are the sustainable design<br />

elements being considered?<br />

A conscious effort will be maintained throughout design and<br />

construction to prioritize durable and environmentally friendly<br />

products. An opportunity exists for the installation <strong>of</strong> sustainable<br />

technologies in the future.<br />

34 What are the project’s<br />

environmental impacts?<br />

The area <strong>of</strong> the Bay bottom that is shaded by the Pier will be<br />

reduced by approximately 90,000 sq ft due to a reduction in<br />

footprint, which will benefit sea life; the parking surface will<br />

be reduced by approximately 30,000 sq ft on the Uplands;<br />

and the number <strong>of</strong> pilings penetrating the Bay bottom will be<br />

diminished. The Tampa Bay Regional Planning Council’s Agency<br />

on Bay Management has stated in a report that “removal <strong>of</strong> the<br />

existing structure, and the replacement with a new structure that<br />

has no parking and limited driveway, will improve water quality in<br />

the area.”<br />

35 What is the schedule for the<br />

project and when will the existing<br />

Pier close and be demolished?<br />

The existing Pier will close on May 31, 2013. Demolition is<br />

scheduled to begin in August 2013. Construction on the new Pier<br />

will begin in January 2014 and last approximately 18 months. The<br />

new Pier will open during Fall 2015.<br />

36 What is the Canopy made <strong>of</strong> and<br />

how will the <strong>City</strong> keep it clean?<br />

The construction materials considered were analyzed to select<br />

the lowest maintenance finishes for <strong>St</strong>. <strong>Petersburg</strong>’s severe<br />

climate. The Canopy is made <strong>of</strong> matte finish aluminum panels<br />

supported on a metal structure. Exposed horizontal beams were<br />

eliminated from the design wherever possible to discourage<br />

roosts for birds. The A/E team is also considering the installation<br />

<strong>of</strong> a manually operated water wash system that would be<br />

integrally located at the top <strong>of</strong> the Canopy.<br />

37 What is the height at the top <strong>of</strong><br />

the Canopy? How high are the<br />

elevated viewing platforms?<br />

The height at the top <strong>of</strong> the Canopy is 86 ft. The height to the<br />

highest elevated viewing platform is 52 ft. For reference, the<br />

height to the top <strong>of</strong> the existing Pier is 78 ft and the height at the<br />

ro<strong>of</strong> terrace is 52 ft.<br />